ISOLDE Technical Coordination Meeting (LS3)

→ Europe/Zurich
508/1-001 (CERN)

508/1-001

CERN

20
Show room on map
Zoom Meeting ID
62093336977
Host
Joachim Vollaire
Useful links
Join via phone
Zoom URL
    • 14:00 → 14:05
      General news - Review of minutes 5m
      Speakers: Erwin Siesling (CERN), Hanne Heylen (CERN), Joachim Vollaire (CERN)
    • 14:05 → 14:15
      Safety matters 10m
      Speakers: Andreas Herty (CERN), Hanne Heylen (CERN), James Devine (CERN), Joachim Vollaire (CERN)
    • 14:15 → 14:20
      IBDRS project update - Work in the primary areas - BTY line @ 2 GeV 5m
      Speakers: Ana-Paula Bernardes (CERN), Joachim Vollaire (CERN), Melania Averna (CERN)
    • 14:20 → 14:25
      RILIS Laboratory upgrade project - Exhaust gas line re-routing - activities update 5m
      Speakers: Carlotta Porzio (CERN), Katerina Chrysalidis (CERN), Laura Lambert (CERN), Sebastian Rothe (CERN)
      • decabling:
        • overall went well (2 bins full removed) with small cut caused in vacuum PLC -> Abel identified a blown fuse which was replaced and PLC came back with this 
        • Second round of decabling dates proposal: week 50 (Dec 7-11) -> OK?
      • Resin and painting ongoing
        • Platform resin started on Friday
        • This week will also cover the GLM area
      • Vac pipe removal ECR approval date extended to Oct 23rd
      • shielding installation in the week of 9th November: would arrive the week before to be out in the SAS (Thu/Fri) ok?
    • 14:45 → 14:55
      Mechanical Workshop and other support requests 10m
      Speaker: Oscar Fjeld (CERN)

      Last week:

      • VITO RF-line - two steel plates remachined following a design correction. Several setups were needed due to the plate size.

       

      • Building 275 - wooden room enclosure dismantled and removed to free up space.

       

      • COLLAPS - Aluminium flange and two stainless-steel screws turned down to fit the assembly.

       

      • VITO - central 8 mm hole drilled in a stainless-steel KF-25 flange.

       

      Development and follow-up:

      • 508 mechanical workshop - layout concept developed, including equipment positions, storage and power

        • Offer recieved for upgrading machine park - to be discussed 

        • Offer for moving cable trays and new power sockets, waiting for on site meeting.

      • Building 170 sign - design and mounting details developed; manufacturing files and drawings updated to 304 stainless steel.

        • Sign quotation - Xometry offer reviewed: EUR 2,691.51 including freight and pressure plates.
        • concept for 179 in work.

    • 14:55 → 15:00
      Planned visits and AOBs 5m
      Speaker: Hanne Heylen (CERN)
      • Removal of 508 ramp starting 26/10
        • No vehicle access -> reminder will be sent
      • Dosimeters for visits: last week, at a moment, we didn't have enough dosimeters since they were used in the separator zones
        • Needs to be confirmed by visits coordination if any visits are planned, ideally, these dosimeters are reserved for visits.
        • Group name Visitors Start
          VIE visit - linac display 1 26/10/2026 13:30
          Swedish Teacher Programme 24 28/10/2026 11:00
      • Projector cable 508 was replaced —> possible again to connect laptop directly