VITO RF-line - two steel plates remachined following a design correction. Several setups were needed due to the plate size.

Building 275 - wooden room enclosure dismantled and removed to free up space.

COLLAPS - Aluminium flange and two stainless-steel screws turned down to fit the assembly.

VITO - central 8 mm hole drilled in a stainless-steel KF-25 flange.

Development and follow-up:
508 mechanical workshop - layout concept developed, including equipment positions, storage and power
Offer recieved for upgrading machine park - to be discussed

Building 170 sign - design and mounting details developed; manufacturing files and drawings updated to 304 stainless steel.