Ddev

→ Europe/Zurich
2/R-014 (CERN)

2/R-014

CERN

10
Show room on map
Alexandre Franck Boyer (CERN)
Zoom Meeting ID
62504856418
Host
Federico Stagni
Useful links
Join via phone
Zoom URL

## Key Outcomes

The team reviewed active pull requests across FTS agent refactoring, security hardening, and stored procedure migration. A key policy decision was reached on ADR mutability during initial development phases. Discussion on system enable/disable flags concluded with tentative agreement on Option B (service + task group toggled together), with further offline discussion needed.

## Decisions Made

- **FTS deadlock hot-fix** is ready for review; Andre and EP assigned as reviewers. 
- **Stored procedure** performance validated on one machine; will replace existing implementation after testing on additional machines. 
- **INT → BigInt migration** not recommended for others; only HCD is near the 2-billion limit, and DRX database versions are coming in the medium term. 
- **ADR mutability policy:** During initial development, ADRs may be edited (not replaced) by designated architects (Chris, Christophe, Alexander) via dedicated PRs, separate from code PRs; once a system reaches production use, ADRs become immutable and new ones are created for changes. 
- **System enable/disable flags (Option B):** A system flag should toggle both its service (FastAPI router) and associated task group; dependency logic (e.g., transformation system requires data management) to be resolved at boot time via ~10 lines of Python checking environment variables. 
- **Argo CD compatibility** identified as an open question; secrets and DB initialization workflows need further analysis before a path forward is confirmed. 

## Completed

- Multiple security hardening PRs merged across the T-Rail Grid organization (reduced tokens, CI app connections, Renovate and Pixi rollout). 
- Helm chart architecture discussion with Valentin concluded; agreement reached that CMS use cases (pre-generated secrets/configmaps) are valid and already partially supported. 
- Janusz opened documentation PRs for API files and DiracX tasks. 

## Blockers

- **Renovate PR volume** (~20/day now that all repos are configured) → EP: batch/auto-merge configuration needed this afternoon. 
- **Post-Transformation System PR** has failing tests linked to security hardening changes → EP + relevant contributor to coordinate via PR comments. 
- **Helm chart MySQL/MariaDB CI test** (Ryan's PR) flagged as wrong approach by Christophe; needs a new PR using the developer section with factorized DB option. 

## Pending Confirmation

- **HEPSPEC23 / spectrum scoring table** integration approach (static CSV vs. parallel reporting of both metrics) — offline meeting to be scheduled between EP, Federico, and relevant stakeholders. 
- **Francesco's entry-point naming cleanup** PR — draft in progress; EP to verify no real deployment breakage before merge. 
- **FTS agent refactoring** PR (for FTS4 server support) — not yet opened; coming soon. 
- **System dependency flag implementation** — EP to revisit Francesco's existing PR to check alignment before next TDEV. 
- **Feeder/packer protocol** discussion deferred to tomorrow's transformation system meeting. 

## Open Questions

- How configuration service reflects system enable/disable environment variables (raised by Juraj). 
- Whether RSS should always be mandatory (never toggled off) vs. treated as an optional system. 
- Full DAG-style dependency management between systems — acknowledged as premature; revisit when real need arises. 

## Action Items

- **EP:** Configure Renovate auto-batching/merging this afternoon. 
- **EP:** Review Francesco's PR on system enable/disable; adjust or re-discuss at next TDEV. 
- **EP:** Create issue with ADR policy documentation (definition of done = written rules + update existing transformation ADRs based on merged PRs). 
- **EP:** Schedule short offline meeting on HEPSPEC23 integration approach. 
- **Christophe:** Run additional FTS deadlock trigger test (likely tomorrow); complete FTS4 refactoring PR. 
- **Ryun:** Open new PR for MySQL/MariaDB CI test using correct developer-section approach. 
- **Giulio:** Read Helm chart architecture issue; connect with Valentin on CMS Helm chart consolidation. 
- **Loris:** Follow up on RSS update (no progress this week). 
- **Janusz:** Add comment clarifying Pydantic attribute documentation approach in DiracX tasks PR. 

## Next Meeting

Transformation system meeting scheduled for the following day (online); full team sync the week after.

There are minutes attached to this event. Show them.
    • 10:00 → 11:00
      Dirac(X) developers (Ddev): Dirac(X) developers
      Convener: Alexandre Franck Boyer (CERN)

      # DIRAC Development Meeting (Ddev)

      **At CERN:** Federico, Alexandre, Alexander, Alan, Marco, Diego, Andre
      **On Zoom:** Bertrand, Francesco, Heloise, Janusz, Juraj, Jorge, Benedikt, Andrei, Giulio, Mazen, Loris, Christophe
      **Apologies:**

      ## Product Goals & Roadmaps

      ## Refinements 

      ### Needs triage

      https://github.com/orgs/DIRACGrid/projects/30/views/7

      **Goal: build a shared understanding of the project.**

      > .github

      > DIRAC
      - [Add getFileUserMetadataBulk to the DFC](https://github.com/DIRACGrid/DIRAC/issues/8826)

      > DiracOS2

      > WebAppDIRAC

      > diracx-web

      > diracx
      - [What is a system in DiracX](https://github.com/DIRACGrid/diracx/issues/1169)
      - [ADR: when should they be considered as immutable?](https://github.com/DIRACGrid/diracx/issues/1180)

      - [Complete and enforce the package structure conventions](https://github.com/DIRACGrid/diracx/issues/1172)

      - [DB Migration](https://github.com/DIRACGrid/diracx/issues/982) - to elaborate
      - [Discussion about PRs](https://github.com/DIRACGrid/diracx/discussions/1155)
      - [Discussion about AI Agents](https://github.com/DIRACGrid/diracx/discussions/1156)

      > Pilot

      > diracx-charts

      - [MariaDB tests](https://github.com/DIRACGrid/diracx-charts/pull/325#issuecomment-6952723101)

      > dirac-cwl

      > signurlarity

       

      **External deps**

      ### [Temporary Section] In progress, predating the new organization

      https://github.com/orgs/DIRACGrid/projects/30/views/8

      Various people still need to deal with old and staled PRs. We will take them into account in the next sprints. 

      ### External dependencies

      https://github.com/orgs/DIRACGrid/projects/30/views/9

      ---

      [Planning Poker](https://en.wikipedia.org/wiki/Planning_poker)

      Story points estimate the effort to get an item **merged**: design, code, tests, docs **and review**.
      - `1pt`: Trivial, very clear (small bug fix, config change). One small PR, reviewed in minutes.
      - `2pts`: Small, well understood (small feature, clear requirements). One PR, easy to review.
      - `3pts`: Medium, some unknowns (moderate feature). One or two PRs, each easy to review in one sitting.
      - `5pts`: Large, significant complexity (major feature, integration). Most of a person's sprint; several PRs; interfaces agreed on the issue before coding.
      - `8pts`: Too large for one sprint: **split before starting**.
      - `13+pts`: An epic, not an issue: split into issues.
      - `?`: not enough knowledge to answer (remember it's ok to ask any questions)


      ## Sprints

      ### Planning (Velocity and Planning Poker)

      - Backlog: https://github.com/orgs/DIRACGrid/projects/30/views/3
      - Current Sprint: https://github.com/orgs/DIRACGrid/projects/30/views/1

      ![](https://codimd.web.cern.ch/uploads/upload_aedced1e1cea8ee36e3fe535db7a998a.png)

       

      **Average Velocity: ~5.8 x FTEs** *Last update: Jun 25th*

      #### :warning: Velocity is a planning tool, not a performance target

      - Velocity going down is NOT bad
      - Velocity going up is NOT always good (might mean over-estimation)
      - Velocity varies sprint-to-sprint
      - We track it to improve estimation, not to judge people

      **What affects velocity:**
      - Estimation accuracy (we're still learning)
      - Complexity of work

      **Our focus:** Delivering value and hitting commitments, not maximizing velocity numbers.

      ### November 26th (IN PROGRESS):

      #### Target and Context

      - **Transformation System**
          - Able to run a simple workgraph (only happy path) (3/2)
      - **Transition**: 
          Clean up existing issues/PRs: [Burning Charts](https://github.com/orgs/DIRACGrid/projects/30/insights?period=3M)
      - **RSS**: Finish Phase2
      - **Compute Backend**:
          - `intercede`: credentials & first backends (HTCondor)

      #### Availability

      - [name=Alexandre] 80%
      - [name=Natthan] 10%
      - [name=Luisa] %
      - [name=Loris] 20%
      - [name=Stella] %
      - [name=Jorge] 10%
      - [name=Ryun] 30%
      - [name=Federico] 10%
      - [name=Héloïse] 20%
      - [name=Christophe] 10%
      - [name=Chris] 10%
      - [name=Janusz] 20%
      - [name=Mazen] 5%
      - [name=Andrei] %
      - [name=Simon] %
      - [name=Daniela] %
      - [name=Hideki] %
      - [name=Benedikt] 10%
      - [name=Juraj] 5%
      - [name=Todor] 10%
      - [name=Henryk] %
      - [name=Dhiraj] 20%
      - [name=Vijay] 10%
      - [name=Andrea] %
      - [name=Alan] 30%
      - [name=Camille] %
      - [name=Marco] 20%
      - [name=Valentin] 10%
      - [name=Alexander] 100%
      - [name=Francesco] 10%
      - [name=Pantellis] 5%
      - [name=Quinn] 10%

      _ FTEs * _ = _ story points

      Expected Story Points:
      Persons:
      Expected Velocity:


      #### Sprint Planning: 

      - Backlog: https://github.com/orgs/DIRACGrid/projects/30/views/3
      - Sprint: https://github.com/orgs/DIRACGrid/projects/30/views/1

      ### November 12th (DONE):


      Expected Story Points: 55
      Persons: 4.9
      Expected Velocity: 11.2

      17 / 4.9 = 3.5

      Comments:
      - It's been a few sprints we have people providing their availability (10/20%) and not picking any task. Is that expected? Please try to adjust over time.
      - A lot of tasks in progress: not sure whether they could have been splitted in further issues as they would have been depending on each other (can be discussed in the retrospective) 

      #### Sprint review: https://github.com/orgs/DIRACGrid/projects/30/views/11

      Related to our goals:
      - **Transformation System**
          - First Dummy Compute Backend implementation: just move status of a parcel to `Done`

      - **RSS**
          - NTR

      - **DiracX Compute Backend**
          - NTR

      - **DIRAC maintenance:**
          - Mostly seucurity/bug fixes + improving performances
          

      #### Sprint retrospective

      *The sprint is a boat :boat: ; we are trying to reach an island (target); identify anchors (what slowed you down), wind (what helped), and rocks ahead (risks for next sprint)*

      :warning: **Focus on the process, not people. We're here to improve together! 🚀**

      **:anchor: Anchors (what slowed you down)**
      - *Example: Unclear requirements on X; Waiting for Y delayed Z; ...*
      - [name=Natthan] signurlarity release did not work
      - [name=Dhiraj] no issue for analytics: we should have one. [name=Dhiraj] will open one
      - [name=Alexandre] no explicit rule on who should merge when there are many reviewers: some were merged to soon, and followed up by other PRs.
          - The rule for the TS is that the main architects merge (we can still all review). [name=Chris] and [name=Christophe] will have an 1h-session to merge.
      - [name=Alan] unclear requirements (e.g. hashing utility).
          - [name=Christophe] we probably can't do much, it's part of the natural workflow.
      - [name=Alexandre] Feeder and Packer were really big. We changed the values of the SP.
          - [name=Marco] Let's not panick for now.

      **:cloud: Wind (what helped)**
      - *Example: Good communication in weekly meetings; Quick code reviews; Clear acceptance criteria on user stories; ...*


      **🪨 Rocks (risks for next sprint)**
      - *Example: Team member K on vacation; Dependency on external API L; Technical debt in M; ...*
      - 3 day CMS workshop

      ---

      ### Previous Sprints

      #### Summary

      - October 29th:
        - *33 Story Points / 3.8 people = 8.7 velocity*
        - Comments: NTR

      - October 15th:
        - *17 Story Points / 3.8 people = 4.5 velocity*
        - Comments: Preparation of the DIRAC User Workshop

      - October 1st:
        - *13 Story Points / 2.1 people = 6 velocity*
        - Comments: Preparation of the DIRAC User Workshop

      - September 17th:
        - *35 Story Points / 3.3 people = 10 velocity*
        - Comments: Preparation of the DIRAC User Workshop + CHEP Papers + CMS Computing Workshop

      - September 3rd:
        - *18 Story Points / 2.3 people = 7.8 velocity*
        - Comments: LHCb Week + many urgent fixes on DIRAC slowed down the main reviewers

      - August 20th:
        - *7 Story Points / 2.5 people = 2.8 velocity*
        - Comments: too many items given the number of people, but still a few items going from 1 sprint to another (mostly due to holidays here)

      - August 6th:
        - *22 Story Points / 3.1 people = 7.1 velocity*
        - Comments: almost managed to reach the expected velocity, but the defined goal are not yet reached, probably too many. Seems like we better plan when everyone is on holidays :slightly_smiling_face: 

      - July 23rd:
        - *19 Story Points / 3.7 people = 5.1 velocity*
        - Comments: NTR

      - July 23rd:
        - *19 Story Points / 3.7 people = 5.1 velocity*
        - Comments: NTR

      - July 9th:
        - *27 Story Points / 4.3 people = 6.3 velocity*
        - Comments:
          - A lot of people ramping up since the hackathon, a lot of invisible design work under the hood that does not translate into PR merged for now.

      - June 25th:
        - *18 Story Points / 4.2 people = 4.3 velocity*
        - Comments:
          - As usual, we are still overestimating our efforts. A lot of unexpected bug fixes preventing us from going forward with current items.

      - June 11th:
        - *20 Story Points / 3.8 people = 5.2 velocity*
        - Comments:
          - Big difference between expected velocity and effective one. 

      - May 28th:
        - *16.2 Story Points / 4.2 people = 3.8 velocity*
        - Comments:
          - Big difference between expected velocity and effective one. 
          - CHEP planning and long weekends (CH, France) largely affected it.

      - May 14th:
        - *11 Story Points / 4 people = 2.75 velocity*
        - Comments:
          - Lowest velocity since we started, but:
          - RSS end of phase1 is actually trickier than what we initially thought
          - Many people having to start preparing presentations (CHEP, LPC retreat)
          - Many people are working on tasks that are not in the scope of the sprint (to prepare future sprints): LHCb commands to replace the workflow modules, integration of CWL job submission endpoint within diracx
          - A CI failure in DIRAC preventing from merging

      - April 30th:
        - *42 Story Points / 4.1 people = 10.2 velocity*
        - Comments:
          - ~1/4 of the counted SP come from the integration of the tasks
          - `diracx-tasks` are here :tada: 
          - All the essential components are here to transition now.
          - RSS Phase1:
            - Should have been completed but it's still under development. [name=Loris] any blocking point? 
          - New Matcher: 
            - working on a v0.2 schema design expliciting more details about what we want

      - April 16th:
        - *20 Story Points / 2.6 people = 7.7 velocity*
        - Comments:
          - Less people available during the sprint (holidays, CTAO had deadlines). Also some people seemed to spend more time than originally described, some of them less time.
          - A lot of bug fixes that were not planned

      - April 2nd:
        - *37 Story Points / 3.1 people = 11.9 velocity*
        - Comments: NTR

      - March 19th:
        - *23 Story Points / 3.5 people = 7.2 velocity* 
        - Comments:
          - Need to adapt the velocity computation because we are processing a lot of tasks not planned originally in the sprint (which is expected since we still have a lot of PRs without any attached issue to process, ...)

      - March 5th:
        - *19 Story Points / 2.8 people = 6.8 velocity*
        - Comments:
          - Less people available during this sprint, but more realistic expectation, we almost reached the expected velocity!!
          - LHCb AI hackathon: [name=Alexandre] was much less available than expected.
          - Took into account items that were in progress before scrum process (added some SP): resurrecting diracx-web, RSS simplified...

      - February 19th:
        - *38 Story Points / 4.4 people = 8.6 velocity*
        - Comments:
          - French holidays
          - [name=Alexandre] was more available than expected, but did not manage to quickly follow all the PRs.
          - A few tasks have been delayed (10 SP): waiting for further discussion on scheduling and diagrams for new LHCb workflows
          - Lot of "unplanned" items: expected as long as we have to deal with the large backlog of old items.

      - February 5th:
        - *29 Story Points / 3.1 people = 9.4 velocity*
        - Comments:
          - LHCb-CERN had a computing workshop
          - Various people worked on old PRs I did not take into account :warning:

      - January 21st:
        - *6 Story Points / 2.5 people = 2.4 velocity*
        - Comments:
          - LHCb-CERN had a team retreat, LHCb-Spain had a conference.

      - January 7th:
        - *15 Story Points / 3.9 people = 3.8 velocity*
        - Comments:
          - No specific comment, the sprint was split by the holidays.

      - December 10th:
        - *6 Story Points / 3 people = 2 velocity*
        - Comments:
          - About the same as the previous sprint: still a gap between expected/actual availability

      - November 26th:
        - *6 Story Points / 3 people = 2 velocity*
        - Comments:
          - Much lower than the previous sprint because it included tasks started before the sprint.
          - Lots of "almost done" PRs: we are improving the description of the tasks and their size but still not enough (each task should bring value though).

      - November 10th:
        - *22 Story Points / 4.3 people = 5.1 velocity*


      #### Actionable Results from the Retrospective

      > may be we should track the technical debt (have a metric about that)

      - **Action:** Random person should take care of the Renovate PRs during a sprint (will do the 1st round and prepare some documentation for the next one)
        - Owner: Alexandre
        - When: Sprint27
        - Status: 12/11/26 In Progress
      - **Action:** Everyone should contribute to the reviewing process
        - Owner: developers
        - When: Sprint27
        - Status: 12/11/26 In Progress
      - **Action:** Story Points should also take into account the amount of work to do and review, not just the complexity
        - Owner: Alexandre
        - When: Sprint27
        - Status: 12/11/26 DONE
      - **Action:** Developers should start reviewing PRs if they have some time available and they finished their tasks (at least the first passes)
        - Owner: developers
        - When: Sprint17
        - Status: 11/06/26 In Progress
      - **Action:** Share a more detailed roadmap that we should all understand.
        - Owner: architects
        - When: Sprint17
        - Status: 11/06/26 In Progress
      - **Action:** Reviewer has to double check titles of the PRs before merging.
        - Owner: reviewers
        - When: Sprint16
        - Status: 11/06/26 In Progress 
      - **Action:** Feature PRs should be thoroughly tested in certification.
        - Owner: developers
        - When: Sprint12
        - Status: 29/04/26 In Progress
      - **Action:** Avoid verbose (AI-generated) issues with many implementation details that can deprecate over time.
        - Owner: developers and product owners
        - When: Sprint11
        - Status: 15/04/26 In Progress
      - **Action:** Better view of the PRs ready to be reviewed vs needing changes.
        - Owner: developers
        - When: Sprint8
        - Status: 15/04/26 In Progress
      - **Action:** Better communicate when a PR is going to be big, as soon as possible. Split the work in this case.
        - Owner: developers
        - When: Sprint6
        - Status: 21/01/26 DONE
      - **Action:** Better use of the mattermost channel to get reviews on a given PR
        - Owner: everyone
        - By when: Sprint3
        - Status: 04/02/26 DONE
      - **Action:** Define estimates and velocity based on Sprint2's results, taking into account external contributions (bonus Story Points) and availability
        - Owner: alexandre
        - By when: Sprint3
        - Status: DONE
      - **Action:** Better define the scrum roles
        - Owner: alexandre
        - By when: Sprint5
        - Status: DONE
      - **Action:** Better define `DONE` criteria (what should be included into the PR, and how to make sure we are not introducing too much technical debt)
        - Owner: everyone
        - By when: Sprint2
        - Status: DONE
      - **Action:** Avoid planning dependent tasks in a same sprint
        - Owner: everyone
        - By when: Sprint2
        - Status: DONE

      ## AOB

      Slurm: new version
      - changed behaviour

      ```
      Hi folks, just a heads up about something we found out recently at CMS that might also affect DIRAC pilots. A recent Slurm version had a change in behavior that caused issues for CMS pilots in at least one site (see the [original discussion](https://helpdesk.ggus.eu/#ticket/zoom/1004044)).

      Slurm 26.05.0, released in May 2026 introduces the following [change](https://github.com/SchedMD/slurm/blob/490ce34caf2ea122ab85b926b4b36f0f56302b8e/CHANGELOG/slurm-26.05.md?plain=1#L72):

      > Set max_nodes from num_tasks when not explicitly set

      CMS pilots do not explicitly set max_nodes or num_tasks on their requests to the CE. This caused the max_nodes parameter to change after the Slurm update.

      After 26.05.0, the pilots reach Slurm with the following parameters:

        NumNodes=1-8 NumCPUs=8 NumTasks=8 CPUs/Task=1

      While I expected to see something like this:

        NumNodes=1 NumCPUs=8 NumTasks=1 CPUs/Task=8

      The result of the change is that this particular site stopped running CMS pilots because the Slurm queue only accepted jobs with NumNodes=1. The site admin did a workaround to allow jobs with NumNodes=1-8 in the queue, but IMO this is not a definitive solution. The semantics of a pilot (at least for CMS) is a single task running in a single node, it does not make sense to divide and distribute a pilot across several nodes. For the moment the workaround works, but our goal is to have the num_tasks parameter set to 1 explicitly on the client (GlideinWMS).

      So far I believe the grid middlewares CMS uses (ARC and HTCondor-CE) do not expose this parameter to the client. So there is work to be done on the middlewares to allow that.

      Check if you are setting the num_tasks parameter explicitly when interacting with Slurm sites. If not, you might bump into similar issues as sites start upgrading to Slurm 26.05.x.
      ```