ICL Meeting ISOLDE complex
→
Europe/Zurich
17/1-007 (CERN)
Description
- IBDRS
EN-ACE :
- EN-CV platform to be integrated
On going
Check clash after final 3D integration
Valve maintenance access: topic to clarify with CV-SCE-ACE
EN-THE:
Optimisation of the volumes and spaces
- Platform + rail: 3D model to be updated
On going
EN-CV:
- vannes d’arrêt au fond de la cheminée
- Ventilation B.170 consolidation: Decision to be taken in November 2026. Study merging B.170 and B.738 ventilation to be investigated if CONS is confirmed. Pipes in B.738 not impacted in case of change.
On going
- Dump cooling skid to be finalised and integrated
On study
Stefano:
- Feed-back on inspection for the carottage N4, moved to week 41 with RP measurements
Postpone
- Modify closing of the target area “fosse"
- Stefano et Antoine propose modification ouverture fermeture Fosse
- RILIS
SCE 3D model: Removing column and add bracket
On going, almost done
SCE: some update need to be done on the opening of the doors, for emergency reason
On going
EN-ACE: some adjustments around the BORIS tube, Lukas working on it, simulation of the installation done by V.Barozier, SCE should also be involved
Mise à jour des blindages
- Renforts sous le plancher mis en place pour la struture et le Boris tube
- Réunion faite avec fournisseur, en attente d'un nouveau 3D
- COLARIS
EN-ACE:
- Emergency proposal could be modified, open discussion with HSE
- Some ventilation proposal in the model
- Detail a bit more the design on the pilar horizontal tube, design from Tim
- Integrate the fixation of the tubes on the plateform and passerelle
- Exit doors need to be study
- Position to double check of the laser on the CHRIS and Collapse sides
SCE
Zakaria not available, SCE should propose a meeting to organise the work
There are minutes attached to this event.
Show them.