After 18 months of shutdown, the AD and its experimental areas will be re-started
in essentially the same configuration as in 2004. Before starting up with beam, a
comprehensive test of all AD equipment as well as a cold check-out will be
required. This talk will deal with issues concerning the startup planning such as
access, beam requirements, status of AD sub-systems and AD modifications. Emphasis
will be given to specific problems related to startup and operation from the CCC
vs. Local Control Room..