10:00
|
Day 1
(until 14:00)
(CR13 - R68)
|
10:00
|
DAQ System Requirements
-
Jean-Sebastien Graulich
(University of Geneva)
(CR13 - R68)
|
10:30
|
Trigger System Requirements
-
Jean-Sebastien Graulich
(University of Geneva)
(CR13 - R68)
|
11:00
|
Online Monitoring Requirements
- Dr
Malcolm Ellis
(Fermilab)
(CR13 - R68)
|
11:20
|
Online Reconstruction Requirements
- Dr
Malcolm Ellis
(Fermilab)
(CR13 - R68)
|
11:40
|
Update on Detector Installation Plan
(CR13 - R68)
|
12:20
|
--- break ---
|
|
09:00
|
DATE Tutorial
(until 12:30)
(R12 (East))
|
09:00
|
System Requirements
(R12 (East))
|
09:20
|
Installation Procedure
(R12 (East))
|
09:40
|
Typical Installation Problems
(R12 (East))
|
10:00
|
DATE Database
(R12 (East))
|
10:20
|
DATE Network
(R12 (East))
|
11:00
|
DATE Processes
(R12 (East))
|
11:20
|
RunControl Human Interface
(R12 (East))
|
11:40
|
Disconnected and Connected Configurations
(R12 (East))
|
12:00
|
Equipments
(R12 (East))
|
|
09:00
|
Day 3
(until 10:00)
(CR13 - R68)
|
09:00
|
Data Unpacking - DATE
-
Jean-Sebastien Graulich
(University of Geneva)
(CR13 - R68)
|
09:20
|
Data Unpacking Software - G4MICE Design
- Dr
Malcolm Ellis
(Fermilab)
(CR13 - R68)
|
09:40
|
Plan for the DAQ System Review
- Prof.
Alan Bross
(Fermilab)
(CR13 - R68)
|
10:20
|
DAQ System Training
(until 12:30)
(R12 (East))
|
10:20
|
Minimal System Configuration
(R12 (East))
|
10:40
|
Minimal Trigger System
(R12 (East))
|
11:00
|
Getting Data
(R12 (East))
|
11:20
|
Unpacking Data
(R12 (East))
|
11:40
|
Developing Readout Code
(R12 (East))
|
12:00
|
Developping Unpacking Code
(R12 (East))
|
|