In 2011 we have two injections at 40, 80 and 158 GeV/c and it was
ok as the beam was well focused and thus the secondary beam intensity
was well above the maximum one given by the rate the PSD double hits)
In 2012 at 13A GeV/c Herbert estimates the intensity to be lower about
factor of 10. In order to partly compensate for this we would need more
injections.
We decided to have:
2 injections at 30A GeV/c,
3 injections at 20A GeV/c and
4 injections at 13A GeV/c
The corresponding NA61 cycles and super-cycle will be prepared.
The NA61 cycles should fit together with the LHC, LHC pilot and
CNGS (if any) cycles.
(the super-cycle lenght has to shorter than 46 sec,
the 4 injections NA61 cycle reads:
4x3.6 (injections) + 1 (acceleration) + 10 (flat top) + 1 (dump) = 26.4 sec