Check of pipe skid (if needed) integration - Stefano-Daniel
Integration of the water pipe
Cost estimation for skid
Cost estimation for piping
Speaker:
Stefano Moccia(CERN)
Slides
14:10
→
14:20
Control: Functional Analysis of Chiller, Water and Brine circuits10m
Comments from the second version Lukasz has delivered.
Comment to the synoptics Lukasz has finalised with Vinod.
Any feed-backs from J&E Hall after their remote access?
Speaker:
Lukasz Zwalinski(CERN)
document
14:20
→
14:30
TS electrical cupboards construction planning10m
Work planning (Florian)
Speaker:
Florian Corbaz(CERN)
14:30
→
14:40
Electrical Cabling10m
Cost of the cabling between SU and SX
Connection path between SX and SH and SU
Connection length estimation: list of cable dimensions and length for the order
- Jan and Sergei M. contact for cabling (Juri and Michail)
Speaker:
Daniel Lefils(CERN)
14:40
→
14:50
2 kW Thermosiphon Tests10m
- problems on the Julabo: report
- minimum temperature reached.
- stability
- water-hammer effect feed-back
Speaker:
Jose Antonio Botelho Direito(CERN)
14:50
→
15:00
C3F8 pipe installation update10m
- compensator installation procedure
- wooden support for pipe to be replaced
- Support lay-out 3D and 2D
Speaker:
Daniel Lefils(CERN)
15:00
→
15:10
Integration: USA15 - roof10m
USA15 integration: where to pass the pipes
Roof integration: advancement drawings
support to Sylwia Wojnarska
Speaker:
Pierre Bonneau(CERN)
Slides
15:10
→
15:20
Dummy load HEX problem10m
- Onda offer
- connection dimansions
- order
- Integration of the HEX in the "balcony unit"
- Safety problem related to 500 kg of glycole - pending
Speakers:
DrEnrico Da Riva(CERN), Jose Antonio Botelho Direito(CERN)
Speakers:
Pierre Bonneau(CERN), Stephane Berry(CERN)
15:30
→
15:40
Condenser contract10m
- DN 50 degassing flange installation
- standard flanges on brine side
- news from HSE concerning design calculation
- Welding Specification Procedure - Said