Control: Functional Analysis of Chiller, Water and Brine circuits10m
Comments from the second version Lukasz has delivered.
Comment to the synoptics Lukasz has finalised with Vinod.
Any feed-backs from J&E Hall after their remote access?
Speaker:
Lukasz Zwalinski(CERN)
14:20
→
14:30
TS electrical cupboards construction advancement10m
Detailed work planning (Florian)
Speaker:
Florian Corbaz(CERN)
14:30
→
14:40
Electrical Power Supply and Cabling10m
Connection length estimation: list of cable dimensions and length for the order
- Jan and Sergei M. contact for cabling (Juri and Michail)
Speaker:
Daniel Lefils(CERN)
14:40
→
14:50
2 kW Thermosiphon Tests10m
- problems on the Julabo: report
Speaker:
Jose Antonio Botelho Direito(CERN)
14:50
→
15:00
J&E Hall Chiller technical Documentation10m
Speaker:
Michele Battistin(CERN)
15:00
→
15:10
C3F8 pipe installation update10m
- compensator installation procedure
- wooden support for pipe to be replaced
- Support lay-out 3D and 2D
Speaker:
Daniel Lefils(CERN)
15:10
→
15:20
Integration: USA15 - roof10m
- USA15 integration: where to pass the pipes
- Roof integration: advancement drawings
- support to Sylwia Wojnarska
- Approval from CV/DOW + ATLAS (Tatiana)
Speaker:
Pierre Bonneau(CERN)
15:20
→
15:30
Dummy load HEX itegration10m
- Integration of the Onda HEX in the "balcony unit"