- Pump skid construction ordered
- Integration of water pipe + pipe installation is pending.
Speaker:
Stefano Moccia(CERN)
14:10
→
14:20
Electrical Power Supply and Cabling10m
- HP connection: EN/EL offer ready: works to be done in September 2012
- LP + instrumentation connection: Sergei Malukov will take over.
- UPS: 4 x 5 kW requirement. Where is the power supply? Wieslaw?
Speakers:
Daniel Lefils(CERN), Wieslaw Iwanski(CERN)
14:20
→
14:30
TS electrical cupboards construction advancement10m
Detailed work planning (Florian)
Speaker:
Florian Corbaz(CERN)
14:30
→
14:40
Control: Functional Analysis of Chiller, Water and Brine circuits10m
- Functional Analysis under approval now
Speaker:
Lukasz Zwalinski(CERN)
Slides
14:40
→
14:50
Integration drawings10m
- USA15 integration: final version
- SH1 Roof integration: final version
- SH1 platform: final version
- C6F14 + water pipe: final version
Speakers:
Pierre Bonneau(CERN), Sylwia Elzbieta Wojnarska(Warsaw University of Technology (PL))
14:50
→
15:00
2 kW Thermosiphon Tests10m
- Julabo chiller has been re-installed
- tests can be restarted
Speaker:
Jose Antonio Botelho Direito(CERN)
15:00
→
15:10
C3F8 pipe installation update10m
- compensator installation procedure
- wooden support for pipe to be replaced
- Support lay-out 3D and 2D
Speaker:
Daniel Lefils(CERN)
15:10
→
15:20
Dummy load HEX itegration10m
- Integration of the Onda HEX in the "balcony unit"
Speaker:
Kirill Egorov(Indiana University (US))
15:20
→
15:30
Condenser contract10m
- visit to DATE
- standard flanges on brine side
- news from HSE concerning design calculation
- Welding Specification Procedure - Said