Dr
Gerald Staats
(Forschungszentrum Dresden-Rossendorf)
28/03/2008, 14:00
Resonant Ring Test Bench for Warm Window and Coupler Tests at ELBE.
G. Staats, A. Buechner, H. Buettig, P. Michel, R. Schurig, J. Teichert, A. Winter
A new coupler test bench based on a resonant ring has been built at ELBE in Dresden-Rossendorf to run warm window as well as coupler tests with RF power up to 190 kW (warm window tests up to 250kW) in CW operation. The ring is driven by a...
Mr
Carlos DE ALMEIDA MARTINS
(CERN)
28/03/2008, 14:40
Development of Solid State Long Pulse Klystron Modulators
Framework and report on the first prototype
Mr
Zheng Ting Ang
(TRIUMF)
28/03/2008, 15:20
The TRIUMF ISAC radioactive ion beam facility has been in operation since 2001. The room temperature linear accelerator comprises sixteen independent rf systems and RFQ is the first major system which was installed. The 35 MHz RFQ is designed to accelerate ions of A/q up to 30 from 2 keV/u to 150 keV/u in cw mode. The RFQ structure is 8 meters long and the vane-shaped rods are supported by 19...