Present:
* IC: D. Colling, M. Aggarwal
* IC-LESC: K. Sephton
* QMUL: G.Mazza
* UCL-HEP/CCC: Ben
* BRUNEL/RHUL: Duncan
* LHCB: Raja
1. Site Status
* IC-HEP & IC-LESC
-- MA: IC-HEP
-- High load of biomed jobs on IC-HEP. Therefore IC-HEP site dropping out of BDII. Set limit per user job submission.
-- KS: IC-LeSC
-- New Viking cluster installed with SL4. Next step is to test the cluster on the production system.
-- Need to know the current status of (sgm/prd) pool accounts from experiment point of view.
-- Meeting with MA to discuss in detail.
* UCL-HEP & UCL-CCC
-- Some of UCL-CENTRAL cluster switched off over weekend for urgent air-conditioning repairs
-- Number of nodes in UCL-CENTRAL has been reduced to make room for the new SRIF3-funded facility
-- More jobs from LCG are required. William Hay reported a few jobs from (Atlas, biomed, lhcb and cms). CMS should install their software.
* QMUL
-- GM: SAM tests are improved. Still having problems with (SE free space) SAM test.
-- GM: CMS jobs failing using CERN (RB). The problem is related to a specific node (fe04) used for CMS installation. Alex changed the firewall configuration of the machine.
* RHUL/BRUNEL
-- DR: DPM (Out of memory) problem with RHUL. The problem was previously observed by ATLAS users, it is new for CMS. Solution: Upgrade to most recent version of gLite.
-- DR: Brunel upgraded their network to 300Mbits/s. But Iperf tests( from Glasgow) gives very low bandwidth ( 2Mb/s - 130 Mb/s).
2. Experiment problems/issues (If there any)
* ATLAS
-- none
* CMS
-- DC: CMS starting CSA07 from next week. FTS transfers (8 files) to London (Imperial, Brunel, RHUL).
-- UCL, QMUL -- mainly MC production jobs.
-- SW: Install CMS software at UCL-CC
* LHCb
-- Raja: No distributed analysis on Tier2's. Reconstruction at Tier 1's.
Running test jobs on SL4 cpus.
* Others:
-- None
3. Open tickets & Action List
Ongoing: 1730 Jobs from rb122.cern.ch failing at UKI-LT2-QMUL
Ongoing: lcg utils problems (Imperial & RHUL)
Closed: 1804 CE failure on ce02.esc.qmul.ac.uk (UKI-LT2-QMUL)
-- All Actions: Open
DC:
-- Invite Lucio (QMUL) to join LT2 meetings.
-- Dteam Meeting: The current status of (sgm/prd) pool accounts from experiment point of view.
DR:
-- set up LFC for LT2 VO, with help from Mona
Lucio (QMUL):
-- Follow up with Atlas production status and plans.
SW:
-- Install CMS software at UCL-CC
All:
-- Email site plans for SL4 upgrade
-- Email quaterly report info to David
4. Who is going to join the dteam meeting tomorrow
* David Colling & Duncan
There are minutes attached to this event.
Show them.