Status of the FAIR Synchrotrons

20 May 2014, 16:30
2h
spectrum (darmstadtium)

spectrum

darmstadtium

Board: M-19
Poster Future Experimental Facilities, Upgrades, and Instrumentation Poster session

Speaker

Carsten Omet (GSI Helmholtzzentrum für Schwerionenforschung mbH)

Description

The unique facility for Antiproton and Ion Research – FAIR will deliver stable and rare isotope beams covering a huge range of intensities and beam energies. The construction of the modularized start version of FAIR has been started. Major civil construction measures, e.g. the site preparation and the drilling of the 60 m deep building foundations are presently being implemented. Procurement of components of the accelerator facilities with long production times has been launched and the design and set-up of the corresponding series test facilities at GSI and CERN are under preparation. The design and status of superconducting magnets, rf-systems, injection and extraction systems and beam diagnostics of the heavy-ion synchrotrons will be presented.
On behalf of collaboration: None

Authors

Carsten Omet (GSI Helmholtzzentrum für Schwerionenforschung mbH) David Ondreka Jens Stadlmann (GSI Darmstadt) Dr Peter-Jurgen Spiller (GSI)

Presentation materials