Review of weekly issues by experiment/VO
- LHCb
- CMS
CMS report at ops meeting (Daniele):
" * News on Development:
Logfiles archiving: post-poned to ProdAgent v.0.9. Chained processing: implementantion largely in place, still scheduled for June release; dealing with large MySQL DBs: some improvement indeed came with latest release, still working on it.
* Data certification, Processing at the T0:
CERN very busy with RelVal production. Validated releases: CMSSW v1.8.4, CMSSW V2.0.0_pre9. High statistics RelVal samples could not be started at FNAL due to problem, had to use CERN. Tier-0 unavailable due to production, limited to relVal queue. Upcoming release is the 2.0.0. It will take precedence over 1.1.0_pre1 if necessary, the standard set will run at CERN, the high statistics set will run at FNAL in parallel to massive FastSim production.
* Re-processing:
still running the never-ending CSA07 signal workflows: allrequests finished, waiting for more input datasets, transfers seem not to work as good. Soups at FNAL: work in progress. The important 1.8.4 FastSim production has started: AlcaReco & physics requests, started at all T1 (also those in don, now are used, e.g. FZK and CNAF). Problems mostly at the config level and due to start-up, not really site issues (yet).
* MC production:
40k cosmics data with CMSSW v1.7.7 now available to physicists in global DBS. 10M cosmics requet with CMSSW v1.8.4 has srated in OSG, plus some more samples. FastSim production: all requests injected in ProdRequest.
* Data Transfers and Integrity, DDT-2/LT status:
Low transfer activity (/Prod instance) from CERN to T1 sites (only RAL and FNAL, ~3 TB out of CERN). ~1 TB tape backlog from T1's seen at FNAL. The t1transfer pool at CERN had peaks all within 1k max files to be migrated to tapes. --- Running a campaign to overview production transfers which did not complete within 30 days from the subscription: it will help to cut the tails wherever useless and identify problems/bottlenecks in the production transfer system (or in the transfer tool), much work needed still on top on such provided lists, though. --- DDT status: We have 317 commissioned links (as of April 11th), +23 wrt last week (!). The breakdown is: all 56 T[01]-T1 crosslinks (some to be re-exercised to due back up&runnning after downs); 162/320 (51%) T1-T2 downlinks and 93/320 (29%) T2-T1 uplinks; 6 T2-T2 links. From the "Site Commissioning" pov, concerning the link testing, 37/40 T2 have at least 1 commissioned downlink upink to the associated T1, and - among these - 30 have at least 2 commissioned T1-T2 downlinks. In total, 93% of the previously commissioned links have already PASSED the new metric as of April 11th (2 months after the start of this DDT-2 phase). --- Day-2-day details at https://twiki.cern.ch/twiki/bin/view/CMS/DDTLinkExercising, and (NEW!) more details now visible again online at Nicolo's page: http://magini.web.cern.ch/magini/ddt.html.
* LINKs:
Computing meetings of the week: http://indico.cern.ch/conferenceDisplay.py?confId=31923 "
- ATLAS
- Other