PASTE meeting

→ Europe/Zurich
Andrei Tsaregorodtsev
Description
CERN, bat 2 R-030 To join the telephone conference, click here: https://audioconf.cern.ch/call/0122882 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0122882
Production and PASTE Meeting, 15th January 2008, CERN Chair: A.Tsaregorodtsev Minutes: S. Paterson CERN: M.Bargiotti, G.Castellani, P.Charpentier, J.Closier, U.Marconi, S.Paterson, R.Santinelli, A.C.Smith Phone: R.Bernet, N.Brook, A.Casajus, G.Kuznetszov, M.A.S.Miguelez, M.Sapunov, R.Nandakumar, A.Tsaregorodtsev 0. Ongoing Action List (01) - 06/11/07 - Gianluca, Marianne - Remedy the Exceeded Max Staging Retry jobs and update ProcDB (pending resolution of each case) (02) - 06/11/07 - Gianluca, Marianne - Agents for automatic resolution of IntegrityDB entries should be developed (03) - 30/10/07 - Marianne - Update of LFC replica flags (pending NIKHEF) (04) - 13/11/07 - Marianne - RAL and PIC migrations, FTS job submissions (07) - 27/11/07 - Elisa, Marianne - Prototype bookkeeping with API wrapped in DISET service after ensuring AMGA and Oracle availability on volhcb07 (08) - 04/12/07 - Gianluca, Alexei, Andrei - Checking sporadic failures at GridKa are now pending tests with latest DIRAC version (09) - 04/12/07 - Roberto, Marcos, Gianluca - Develop LHCb SAM framework and summarize architecture for SE tests (21) - 18/12/07 - Roberto, Gianluca - Test RFIO at CNAF, coordinate with local site contacts (23) - 08/01/08 - Nick, Marianne, Raja - Arrange a meeting with RAL management regarding the migration activity (25) - 08/01/08 - Marianne - Resolve why number of processed events is missing in Bookkeeping (also cause of missing files) (26) - 08/01/08 - Joel - Oversee upgrade of volhcb01 now that BK and LogSE are backed up (27) - 08/01/08 - Andrew - Backup DMS services on lxgate34 to allow migration to SLC4 (28) - 15/01/08 - Nick - Trigger arrangement of meeting between RAL, CNAF and Castor team (see Action (21)) (29) - 15/01/08 - Gianluca - Remove lost files at PIC from ProcDB (30) - 15/01/08 - Gianluca - Test NIKHEF after reinstallation of the shared area (00) - 15/01/08 - DIRAC developers - DIRAC3 (ongoing) Completed Actions Done - (06) - 27/11/07 - Andrei - Prepare draft pilot document as internal LHCb note Done - (11) - 11/12/07 - Marianne - Clean up SIM/DIGI for production IDs 1957, 1960, 1962 Done - (14) - 11/12/07 - Joel - Update lhcb-proxy-init with small wrapper to ensure environment is not changed Done - (17) - 11/12/07 - Joel - Prepare MDF workflows (test with v2r18p4 / v2r18p5) Done - (18) - 18/12/07 - Gianluca - Check current status of SAM jobs on Test system Done - (19) - 18/12/07 - Roberto,Joel - Prepare draft of the LFC Admin service interface, comments welcome via email Done - (24) - 08/01/08 - Philippe,Roberto - Investigate setting up an AMGA server on the PPS 1. Production Status Report Minutes from the production meeting are available here. - Remedy Exceeded Max Staging Retry jobs and update ProcDB - Action(01) Work is ongoing, the update of the ProcDB is now urgent and Andrei suggested Gianluca should estimate the effort to resolve this. - Agents for automatic resolution of IntegrityDB entries - Action(02) There is a clear solution for some cases but not all, this work is ongoing while all cases are resolved. - MDF wokflows - Action(17) Joel launched the production yesterday evening and has conveyed the files to Radu to begin transfers. CERN and IN2P3 are capable of running the jobs. PIC, CNAF and RAL are banned from the ProcDB to avoid problems with migrations etc. The list of files lost at PIC was supplied to Gianluca by Marianne. These files are currently being removed from the ProcessingDB. ( ACTION: Gianluca ) A problem with the proxy renewal was reported to Matvey and Andrei. Rather than back-porting code to fix this from DIRAC3 it was agreed to use long proxies in DIRAC2 for now. The corruption of the shared area at NIKHEF was solved by reinstallation via the SAM tests. This should be tested by rescheduling failed jobs. ( ACTION: Gianluca ) The LFC intervention has been postponed and is now foreseen for Thursday. Operations and CCRC08 logbooks were suggested by Philippe and several proposals have been made. It was agreed to standardize on the 'elog' (also used by the Online and detector groups). 2. Production Operations Issues - RAL and PIC Migrations - Action(04) & Action(23) Marianne mentioned that the RAL-disk migration is ongoing and problematic files left over from transfers are being resolved. All files should be checked before releasing the pool. The current estimate is that next week the disk migration will be complete. For RAL-tape, the site admins have been staging the files manually but these are not coming online due to a Castor problem. Nick contacted Andrew Sampson and this was pending until the progress of tape staging was checked. A summary of all the issues to discuss at this meeting should be compiled by Marianne and the agenda should be compiled by Nick ( ACTION: Marianne, Raja, Nick) Roberto checked with Gonzalo and the PIC migration is now scheduled for the week of 21st January. - LFC mirrors - Action(05) Roberto left his test suite running over the break and observed 100% efficiency over the Tier-1 LFC instances corresponding to a constant 1Hz rate. The replication of user and group info tables was also successfully tested. The IN2P3 instance is now in production and NIKHEF / PIC mirrors are planned for the middle of March after the first CCRC phase. Alexey is following the plans at GridKa. The remaining LFC instances can now be added to the production mask. This action will be put on hold until after the first CCRC phase. - Pilot document - Action(06) The draft is attached to the agenda for today. - BK prototype - Action(07) & Action(24) Progressing with port-opening and installation of Bookkeeping. Joel will contact the IT people to trigger installation of Apache on volhcb07. Setting up an AMGA server on the PPS will take the order of months rather than weeks so the current instance will be used. For prototyping purposes, Oracle can be temporarily dropped if this is a stumbling block. Andrei suggested that Marianne should report on the preparatory work for the meeting next week. - Sporadic failures at GridKa - Action(08) Joel has performed preliminary tests last Friday that were successful. This should be rechecked with the latest version of Brunel. ( ACTION: Gianluca ) - RFIO at CNAF - Action(21) Roberto reported the problem with the highest possible priority to the WLCG Operations meeting and also to the CCRC08 meeting since this has rfio at CNAF has not been functional since September 2007. It was suggested to trigger the arrangement of a meeting with the CNAF and RAL site admins as well as the Castor team such that a solution can be found without duplicating effort. ( ACTION: Nick ) 3. DIRAC3 - Distribution of externals Joel mentioned that work is ongoing for the SRM2 external packages. Bundling a UI independent self-consistent set of libraries is of the upmost priority for DIRAC3. - WMS job execution chain status Stuart has written an AgentMonitor that uses the ThreadPool to keep track of pilots. Reorganisation of the input data resolution in the Job Wrapper and other Agent side improvements are pending the stable distribution of externals. - Workflow and Production Management status Gennady can now submit jobs but using workflow as a persistent object is to be discussed with Stuart. Job submission through the API is working. Matvey has started to construct the production monitoring page and Joel / Gennady are asked to take a look at this and make any comments. - Recent CS problems There have been problems with intermittent failures during all components of the framework recently. Adri wil investigate with Andrei and Stuart this afternoon. - Data management status Andrew commented that components from DIRAC2 are being ported to DIRAC3. The RequestDB required a few modifications and the TransferAgent has to be updated to the new ReplicaManager. This should hopefully be completed by the end of the week. The upgrade of the RequestDB instances on the VO-boxes should be performed (starting with Lyon for debugging and can be reserved for DIRAC3 use). Adri will investigate opening of a further port on the PIC VO-box. - Services monitoring status (plots, logging service) Adri is half-way through completing a document about the service monitoring. This will be circulated when available. Raja, Marcos and Matvey are encouraged to propose a consistent picture of service monitoring. 4. AOB None
There are minutes attached to this event. Show them.
    • 09:30 → 09:50
      Ongoing actions 20m
      (01) - 06/11/07 - Gianluca, Marianne - Remedy the Exceeded Max Staging Retry jobs and update ProcDB (pending resolution of each case) (02) - 06/11/07 - Gianluca, Marianne - Agents for automatic resolution of IntegrityDB entries should be developed (03) - 30/10/07 - Marianne - Update of LFC replica flags (pending NIKHEF) (04) - 13/11/07 - Marianne - RAL and PIC migrations, FTS job submissions (06) - 27/11/07 - Andrei - Prepare draft pilot document as internal LHCb note (07) - 27/11/07 - Elisa, Marianne - Prototype bookkeeping with API wrapped in DISET service after ensuring AMGA and Oracle availability on volhcb07 (08) - 04/12/07 - Alexei, Andrei - Further investigate cause of sporadic failures at GridKa for production jobs (pending tests with v2r18p5) (09) - 04/12/07 - Gianluca, Roberto - Prepare an SRM sensor test for the LHCb SAM framework (pending upload to SAM DB) (11) - 11/12/07 - Marianne - Clean up SIM/DIGI for production IDs 1957, 1960, 1962 (14) - 11/12/07 - Joel - Update lhcb-proxy-init with small wrapper to ensure environment is not changed (17) - 11/12/07 - Joel - Prepare MDF workflows (test with v2r18p4 / v2r18p5) (18) - 18/12/07 - Gianluca - Check current status of SAM jobs on Test system (19) - 18/12/07 - Roberto,Joel - Prepare draft of the LFC Admin service interface (21) - 18/12/07 - Roberto, Gianluca - Test RFIO at CNAF, coordinate with local site contacts (23) - 08/01/08 - Nick - Trigger a meeting with RAL management regarding the migration activity (24) - 08/01/08 - Philippe - Investigate setting up an AMGA server on the PPS (25) - 08/01/08 - Marianne - Resolve why number of processed events is missing in Bookkeeping (26) - 08/01/08 - Joel, Marianne - Oversee upgrade of volhcb01 after Bookkeeping is backed-up (27) - 08/01/08 - Andrew - Check feasibility of installing DMS services on SLC4 to allow migration of lxgate34 (00) - 08/01/08 - DIRAC developers - DIRAC3 (ongoing)
    • 09:50 → 10:05
      Production status report 15m
      - Report from the Production meeting:
    • 10:05 → 10:35
      Production operations issues 30m
      - v2r18p6 tests - volhcb01 migration status - CCRC Logging tools
    • 10:35 → 10:45
      Pilot Agents paper 10m
      Paper
    • 10:45 → 11:15
      DIRAC3 tasks 30m
      - DIRAC3 distribution preparation - WMS Job execution chain status - Workflow and Production Management status - Job Monitoring status - Data Management status - Services monitoring status (plots, logging service )
    • 11:15 → 11:25
      AOB 10m