Production and PASTE Meeting, 1st April 2008, CERN Chair: A.Tsaregorodtsev Minutes: S. Paterson CERN: M.Bargiotti, G.Castellani, J.Closier, R.Graciani, G.Kuznetszov, E.Lanciotti, S.Paterson Phone: R.Bernet, N.Brook, U.Marconi, M.A.S.Miguelez, M.Sapunov, A.Tsaregorodtsev Apologies: P.Charpentier, R.Santinelli 0. Ongoing Action List (01) - 06/11/07 - Gianluca, Marianne, Joel - Remedy the Exceeded Max Staging Retry jobs and update ProcDB via development of Agents to resolve this (04) - 13/11/07 - Marianne - RAL and PIC migrations, FTS job submissions (07) - 27/11/07 - Zoltan, Elisa, Marianne - Prototype bookkeeping system on volhcb07 (09) - 04/12/07 - Roberto, Marcos, Gianluca - Develop a general service monitoring framework leading to a virtual control room (27) - 08/01/08 - Andrew - Backup DMS services on lxgate34 to allow migration to SLC4 (46) - 11/03/08 - Angelo, Roberto - Send some test jobs to CNAF to test StoRM (48) - 18/03/08 - Roberto, Gianluca - Investigate the reason for multiple pilots aborted after successful "list-match" check (49) - 18/03/08 - Roberto - Develop and deploy a sensor checking the SAM DB site info against lcg-infosites (50) - 01/04/08 - Gianluca - Investigate the software installation / availability failures of recent production jobs (51) - 01/04/08 - Joel - Prepare production tool 'wish-list' in advance of DIRAC3 week (52) - 01/04/08 - Stuart, Andrei - Plan Production Manager training session (53) - 01/04/08 - Stuart - Introduce splitting of large bulk LFC queries in DIRAC API (00) - 01/04/08 - DIRAC developers - DIRAC3 (ongoing) Completed Actions Done - (41) - 26/02/08 - Marianne - Trigger replication of stripped data to other Tier-1s (RAL, IN2P3) Done - (44) - 04/03/08 - Roberto - Contact NIKHEF about increasing the length of available queues Done - (47) - 18/03/08 - Andrei - Update the proxy renewal procedure on the analysis system (DIRAC v2r19) 1. Production Status Report Minutes from the production meeting are available here. - Remedy Exceeded Max Staging Retry jobs and update ProcDB - Action(01) Gianluca reported progress to the Operations eLog, 40K files in the ProcDB seem to be ok. 2K files statuses failed to update with the CLI for an unknown reason. Andrei suggested further investigating the cause of this failure. Action(01) now merged with Action(42). - RAL / PIC migrations - Action(04) Marianne mentioned that for RAL, Raja was asked to remove two tapes that failed in the past and these FTS jobs have been resubmitted. There are still 46 tapes remaining to be migrated at a rate of 2 per day. Around 2K DIGI files at PIC are still being recovered, the timescale for this is ~1week. - Bookkeeping prototype - Action(07) Elisa has started to migrate the DC06 data with a new method that greatly improves the speed (~40 rows / second). With a subset of the ~28M rows requiring migration the timescale is difficult to determine. Andrei asked how long it could take before a full-scale test of the prototype could take place and Elisa conveyed that the CCRC phase 2 in May may be too early for the full functionality. Population of the prototype (without creation of views etc.) could still take place. Action(07) Now Merged with Action(09) - Monitoring framework - Action(09) Roberto has compiled a detailed list of WLCG services used in Grid including their criticality for LHCb and is awaiting feedback from our side. The next step is to work with Julia's team to provide a prototype based on Service Map. With Andrea Sciaba Pablo Saiz and Alessandro Di Girilamo (ATLAS) there is now a small team for gathering all experiment's requirements about a Service Map. Ricardo mentioned that the Service Map should be complemented with DIRAC services. Action(09) now merged with Action(36). - Test jobs to CNAF to test StoRM - Action(46) Pending the end of the CNAF downtime. - Update the proxy renewal procedure on the analysis system (DIRAC v2r19) - Action(47) The proxy renewal procedure was updated by Andrei. - Investigate Aborted Pilots - Action(48) Debugging on the client side has not shed any light on the cause of this problem. This should be pursued on the server side if possible. - Develop sensor checking SAM DB against lcg-infosites - Action(49) Roberto triggered SAM support to look at the list of CEs supposed to support LHCb and appearing in SAM but not in the BDII. - Zero event files Marianne has been investigating the cause of the discrepancy between the number of events processed and reported in the Bookkeeping. The files have been processed successfully and Marianne is continuing the cleanup. Another case was found where stripped data was missing from the BK since the ancestor files were missing. Simply adding the ancestor file allows the stripped data to be entered. Gianluca discovered 400 jobs recently completed with Post-Mortem Finalization due to an application error. Roland confirmed that this is related to the software installation and it was agreed to check with the affected sites that the shared file systems are powerful enough or whether this is related to the software installation. ( ACTION: Gianluca ) The problems with stalled jobs at IN2P3 appear to persist with several stalled jobs in evidence. Andrei is continuing to debug with local access at the site. There was some discussion about the training of the production management team prior to the second CCRC phase. The tools for the production manager must be defined and Joel agreed to prepare a wish list. ( ACTION: Joel ) It was also agreed to discuss the preparation of a production manager training session, the Wednesday morning of LHCb week was tentatively suggested. ( ACTION: Stuart, Andrei ) 2. Production Operations Issues - Using LFC with bulk queries from Ganga Job splitting on the client side with several thousand files can take O(hours) which is too long for the users. Andrei shortened the timeout between queries in the LFC combined client that should improve the performance. Splitting of bulk requests into e.g. 500 file chunks should be added to the DIRAC3 API and back-ported to DIRAC2. ( ACTION: Stuart ) 3. CCRC2 Schedule The CCRC F2F presentation from Nick is attached to the agenda page. 4. DIRAC3 Tasks - Stripping tests preparation Joel reported that no new progress has been made since last week with the stripping workflow. - AncestorFiles & CondDB Optimizers Stuart reported that CondDB and AncestorFiles optimizers were put in place last Friday. The CondDB optimizer checks available tags in the LFC and holds jobs for a predefined time period before failing them if not available. The AncestorFiles optimizer employs the old genCatalog utility to query the BK for ancestors. - Stager status Stuart conveyed some minor schema changes have been made to the StagerDB but the Stager service is now running and the Agents to make staging requests and montior the progress are being developed. - Copying input data locally to WN Data access issues at several sites have prompted the inclusion of a module to download data local to the WN. This can be a site specific policy of LHCb. - Failover status The workflows should be complemented with failover of data uploads and other operations such as status transitions. Andrei has spent some time investigating workflows as a solution to generic requests. This is currently being finalized. - Accounting, Distribution and Installation tools status The status of these tools will be confirmed during the developer week. The installation procedure should be simplified as much as possible for VO-boxes and clients. 5. AOB Andrei reminded the developers that the DIRAC3 week is scheduled for 7th April.
There are minutes attached to this event. Show them.
    • 09:30 → 09:50
      Ongoing actions 20m
      (01) - 06/11/07 - Gianluca - Remedy the Exceeded Max Staging Retry jobs and update ProcDB via development of Agents to resolve this (04) - 13/11/07 - Marianne - RAL and PIC migrations, FTS job submissions (07) - 27/11/07 - Zoltan, Elisa, Marianne - Prototype bookkeeping system on volhcb07 (09) - 04/12/07 - Roberto, Marcos, Gianluca - Develop a general service monitoring framework leading to a virtual control room (27) - 08/01/08 - Andrew - Backup DMS services on lxgate34 to allow migration to SLC4 (36) - 12/02/08 - Roberto, Gianluca - Investigate other experiments usage and functionality of the Dashboard (38) - 26/02/08 - Zoltan, Elisa, Marianne - Review the view-building process in the Bookkeeping (41) - 26/02/08 - Marianne - Trigger replication of stripped data to other Tier-1s (RAL, IN2P3) (42) - 04/03/08 - Marianne, Gianluca, Joel - Perform an integrity check on the ProcDB and submit pending jobs (44) - 04/03/08 - Roberto - Contact NIKHEF about increasing the length of available queues (46) - 11/03/08 - Angelo, Roberto - Send some test jobs to CNAF to test StoRM (47) - 18/03/08 - Andrei - Update the proxy renewal procedure on the analysis system (DIRAC v2r19) (48) - 18/03/08 - Gianluca, Stuart - Investigate the reason for multiple pilots aborted after successful "list-match" check (49) - 18/03/08 - Roberto - Develop and deploy a sensor checking the SAM DB site info against lcg-infosites (00) - 11/03/08 - DIRAC developers - DIRAC3 (ongoing)
    • 09:50 → 10:05
      Production status report 15m
      - Report from the Production meeting:
    • 10:05 → 10:35
      Production operations issues 30m
      - Using LFC with bulk queries from Ganga
    • 10:35 → 10:55
      CCRC 2 schedule 20m
      Slides
    • 10:55 → 11:25
      DIRAC3 tasks 30m
      - Stripping tests preparation - Copying input data locally to WN - Stager status - Failover status - Accounting status - Distribution, installation tools status
    • 11:25 → 11:35
      AOB 10m