PASTE meeting

→ Europe/Zurich
1/1-025 (CERN)

1/1-025

CERN

20
Show room on map
Andrei Tsaregorodtsev
Description
CERN, bat 2 R-030 To join the telephone conference, click here: https://audioconf.cern.ch/call/0165202 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0165202
Production and PASTE Meeting, 6th May 2008, CERN Chair: A.Tsaregorodtsev Minutes: S. Paterson CERN: P.Charpentier, J.Closier, E.Lanciotti, S.Paterson, R.Santinelli, A.C.Smith, A.Tsaregorodtsev Phone: N.Brook, R.Graciani, G.Kuznetszov, M.Sapunov Apologies: M.Bargiotti, G.Castellani, Z.Mathe 0. Ongoing Action List (01) - 06/11/07 - Gianluca, Marianne, Joel - Remedy the Exceeded Max Staging Retry jobs and update ProcDB via development of Agents to resolve this (04) - 13/11/07 - Marianne, Andrew - RAL and CNAF migration, FTS job submissions (07) - 27/11/07 - Zoltan, Elisa, Marianne - Prototype bookkeeping system on volhcb07 (09) - 04/12/07 - Roberto, Marcos, Gianluca - Develop a general service monitoring framework leading to a virtual control room (27) - 08/01/08 - Andrew - Backup DMS services on lxgate34 to allow migration to SLC4, port IntegrityDB to DIRAC3 (55) - 08/04/08 - Marianne - Recover data that failed to be registered in the BK DB (56) - 29/04/08 - Roland, Stuart, Joel - Provide Production Manager guide (00) - 29/04/08 - DIRAC developers - DIRAC3 (ongoing) Completed Actions Done - (50) - 01/04/08 - Joel - Investigate the software installation / availability failures of recent production jobs 1. CCRC Status Nick agreed to take minutes for this session and post them to the LHCb CCRC ELOG. 2. Production Status Report Minutes from the production meeting are available here. - RAL / PIC migrations - Action(04) - Bookkeeping prototype - Action(07) Elisa reported that the migration is being finished, a suite was developed using Oracle directly due to the AMGA scaling problem. Unfortunately the migration was put on hold due to running out of disk space but this is now resolved. - Monitoring framework - Action(09) The draft proposal will be used to create a service Grid map. - Software Area Corruptions - Action(50) Joel has installed the software necessary for CCRC and is taking care of the SAM suite. 3. Production Operations Issues & 4. DIRAC3 Tasks See CCRC operations minutes. 4. AOB Philippe has added a summary to the ELOG of his results from the investigations into DC06 production status and is starting to perform corrective actions on a best-effort basis. Andrei asked for any and all feedback with regard to the ProcDB interface. Nick suggested asking Cedric to help out with this. Nick also conveyed it was agreed with Doris to reconfigure the spaces at GridKa so the meeting this afternoon is cancelled.
There are minutes attached to this event. Show them.
    • 09:30 → 09:50
      CCRC status 20m
      - Pit gateway intallation - Data cleanup - Data transfers - Site readiness
    • 09:50 → 10:10
      Ongoing actions 20m
      (01) - 06/11/07 - Gianluca, Marianne, Joel - Remedy the Exceeded Max Staging Retry jobs and update ProcDB via development of Agents to resolve this (04) - 13/11/07 - Marianne, Andrew - RAL and CNAF migration, FTS job submissions (07) - 27/11/07 - Zoltan, Elisa, Marianne - Prototype bookkeeping system on volhcb07 (09) - 04/12/07 - Roberto, Marcos, Gianluca - Develop a general service monitoring framework leading to a virtual control room (27) - 08/01/08 - Andrew - Backup DMS services on lxgate34 to allow migration to SLC4, port IntegrityDB to DIRAC3 (50) - 01/04/08 - Joel - Investigate the software installation / availability failures of recent production jobs (55) - 08/04/08 - Marianne - Recover data that failed to be registered in the BK DB (56) - 29/04/08 - Roland, Stuart, Joel - Provide Production Manager guide (00) - 29/04/08 - DIRAC developers - DIRAC3 (ongoing)
    • 10:10 → 10:25
      Production status report 15m
      - Report from the Production meeting:
    • 10:25 → 10:55
      Production operations issues 30m
    • 10:55 → 11:25
      DIRAC3 tasks 30m
    • 11:25 → 11:35
      AOB 10m