Thermosiphon meeting

→ Europe/Zurich
298/1-003 (CERN)

298/1-003

CERN

10
Show room on map
Michele Battistin (CERN)
    • 10:00 → 10:10
      Action List 10m
    • 10:10 → 10:50
      Actions List Review 40m
      Greg Sonar: Waiting for the Mechanical part + the electrons cabinet sonar shall be delivered to 298 to have a dedicated leak test done in the workshop (Pierre + Cyril) Installation on the roof will be done by EN/CV (Cyril). Internal cabling of Sonar will be done by Greg's team Ethernet cable request has been done. Waiting for the Open Days. The cable is waiting on the SX1 on the top just before going to the outside: Netops is waiting for cupboard installation to lay down the aluminium protection to the cupboard and the cable. Action list: Water P&ID: the P&ID does not correspond to the Thermosiphon P&ID Onsite label shall be removed and changed to use the TS naming!!! A conversion table shall be sent to Iniziative (Cecilia) The table shall be done to Iniziative to change the names on the database they are producing (Claudio). Meeting to be organised with Stefano and Guillermo. Michele to do it. Cabling: visit with Anders done. List of actions. Water circuit: no GS on valve GS1531 and the GS on the HV1530 – Information fro Stefano and Iniziative is missing. Cecilia is taking over. Meeting with Stefano. Condenser: one TT on the bottom of the condenser + the TT of Sylvain on the C6F14 installed – they have to be cabled - Florian Swagelock by-pass valve on the liquid line PV1103 has been installed: to be cabled. Sonar part: it will be installed in the next two weeks. To be cabled. Brine: FT1350 to be cabled. By-pass: actuator of valve PV2201 switch to be cabled. On all the external cabling all the "penduilles" shall be black and the white ones shall be taken out (the sun will destroy them) (Cyril = Juri and Michail) External cable tray protection arrived. To be installed during last cabling activity. Check the signal of the scale of the condenser. One power cable is missing: Mito shall lay it down. Nacelle interference in SX1. It can be done after Open Days. Florian to purchase a new cable. We will cable: Red telephone 16 A socket One pipe for vacuum network. To be organised at the beginning of November. Pneumatics: All done but: Switch on the pneumatic actuator is missing on the balcony DN200. Scaffolding can be dismounted. By-pass of the C6F14 to clean the line before connection the condenser. Cyril prepare the material today. Sylvain shall assembly now. Install the by-pass Put the vacuum on the circuit to take out all the water before filling Filling date Monday 4th of November. Finish the insulation on the roof is possible now. Ouvaroff can finish now! Tchuflian shall wait for the final connection to the condenser of the C6F14. Leak check is finished!!! Validation test shall be performed @ 10 bar. Cyril. Chiller: Cyrill to install the CE plates of the heat exchangers and tanks of the chiller. Etiquettes: Pierre is filling the Infor database on excel format Claudio to retrieve the information form Stefano Moccia concerning Water circuit Claudio to recuperate the information for the chiller. One excel file is missing. Excel -> database passerelle (Richard Ecclestone). Once done we can produce the etiquette. Olivier the etiquette printer arrived. Etiquettes for external installation to be done. Hard etiquettes shall be produced (Claudio). Fix the pipe passages on the walls on different locations: Michele sent mail to Eliseo. No answer for the time being. Protection over the hole for the passage of the pipes: ready. To be done airtight. Last 4 plates to be installed. Check the procedure to fill-empty the C6F14 line to connect it to the condenser after cleaning. Filling at filter level Emptying from the technical gallery. Install the dryers and try the filling pump (Pierre + Cyril) after installation of the by pass. Red telephones (Olivier): Install a red telephone on the roof move the red telephone form the balcony moved tomorrow. No news… Ask Eliseo concerning the roof on the condenser (Michele): before snowing… Protect the cable tray on the roof: material is here now. Control: answer from J&E Hall received: Michele and Lukasz to call them today or tomorrow. H2O: Butterfly valves to be replaced. Documentation: Ceclia to suggest a folder structure for EDMS. Claudio to prepare the commissioning forms starting form the commissioning document of UNICOS. I/O commissioning from are ready Functional test from Jose & Daniel docs. Brine temperature regulation to be checked… Pierre has found the positioned for the actuator. To buy. Thermosiphon PLC program is ready: under simulator now. Ask for Benjamin presentation (Michele).
      Speaker: Michele Battistin (CERN)
    • 10:50 → 11:00
      Any Other Business 10m
      Speakers: Claudio Bortolin (Universita e INFN (IT)), Cyril Degeorge (Indiana University (US)), Daniel Lefils (CERN), Florian Corbaz (CERN), Gregory Hallewell (Centre National de la Recherche Scientifique (FR)), Jan Godlewski (CERN), Lukasz Zwalinski (CERN), Olivier Crespo-Lopez (CERN)