Thermosiphon meeting

→ Europe/Zurich
298/1-003 (CERN)

298/1-003

CERN

10
Show room on map
Michele Battistin (CERN)
    • 10:00 → 10:10
      Action List 10m
    • 10:10 → 10:50
      Actions List Review 40m
      Water P&ID: the P&ID does not correspond to the Thermosiphon P&ID Cecilia to supply the conversion table to Stefano Stefano will deliver the updated P&ID We will then modify this with the naming convention used already in the control system of Lukasz Water circuit: Butterfly valves to be replaced (Stefano). Cabling: visit with Anders done. List of actions. Water circuit: no GS on valve GS1531 and the GS on the HV1530 – we need to order a new positioned for these valves (KSB Italie). Meeting with Stefano. the cable tray on the roof shall be protected: material is here now. Cyril and Jan to ask Michail and Juri. Condenser: one TT on the bottom of the condenser + the TT of Sylvain on the C6F14 installed – DONE Swagelock by-pass valve on the liquid line PV1103 has been installed: DONE Brine: FT1350 to be cabled DONE Ineo is cabling now. This is missing: - sonar system - vacuum pump - position switches of the GS1531 and HV1530 - positioner of the brine by-pass Sonar part: it will be installed in the next two weeks. To be cabled. By-pass: actuator of valve PV2201 switch to be cabled. Waiting for the switch. On all the external cabling all the "penduilles" shall be black and the white ones shall be taken out (the sun will destroy them) (Cyril = Juri and Michail) External cable tray protection arrived. To be installed during last cabling activity. Extra-cable lay-down: some cable is missing: Red telephone One general alarm signal 16 A socket One pipe for vacuum network. To be organised at the beginning of November. EL connection: it will be over today!! In 3 weeks the final connection to UPS will be available. APAVE will come next week to check the cupboards. Check the signal of the scale of the condenser. Pneumatics: the final connection between the compressed air and the rack is missing: Cyril and Olivier to discuss it. C6F14 pipe: cleaning: by-pass is ready, just a reduction DN50 DN100 is missing. It will be installed today. Cyril to contact Benjamin to force the brine valve to open to do the vacuum. Filling date Monday 4th of November. Lagging: Finish the insulation on the roof is possible now. Ouvaroff is working on this now! Tchuflian shall wait for the final connection to the condenser of the C6F14. Leak validation test shall be performed @ 10 bar. Cyril. Nitrogen has been ordered. Etiquettes: Pierre is filling the Infor database on excel format Claudio to retrieve the information form Stefano Moccia concerning Water circuit Claudio started entering the information for the chiller. Etiquettes for external installation to be done. Hard etiquettes shall be produced (Claudio). Civil Engineering: Fix the pipe passages on the walls on different locations: Michele has sent an mail to Eliseo again. Ask Eliseo concerning the roof on the condenser: Michele has sent an additional mail Protection over the hole for the passage of the water and C6F14 pipes: to be done. Cyril and Jan to ask Juri and Michail. C6F14 filling: Check the procedure to fill-empty the C6F14 line to connect it to the condenser after cleaning. Filling at filter level Emptying from the technical gallery. Install the dryers and try the filling pump (Pierre + Cyril) after installation of the by pass. Red telephones (Olivier): Install a red telephone on the roof move the red telephone form the balcony moved tomorrow. No news… Documentation: Ceclia to suggest a folder structure for EDMS. Commissioning: Claudio to prepare the commissioning forms starting form the commissioning document of UNICOS. I/O commissioning from are ready Functional test from Jose & Daniel docs. Brine temperature regulation to be checked… Pierre has found the positioned for the actuator. To buy. Control: Waiting for answer from J&E Hall received: Michele to push for this. Thermosiphon PLC program is ready: under simulator now. Ask for Benjamin presentation (Michele). Lukasz control has been installed in the PLC and connected to CCC server.
      Speaker: Michele Battistin (CERN)
    • 10:50 → 11:00
      Any Other Business 10m
      Speakers: Claudio Bortolin (Universita e INFN (IT)), Cyril Degeorge (Indiana University (US)), Daniel Lefils (CERN), Florian Corbaz (CERN), Gregory Hallewell (Centre National de la Recherche Scientifique (FR)), Jan Godlewski (CERN), Lukasz Zwalinski (CERN), Olivier Crespo-Lopez (CERN)