OP DAY 2008

Europe/Zurich
874/1-011 (CERN, CCC Conference Room)

874/1-011

CERN, CCC Conference Room

Karel Cornelis (CERN)
    • SESSION 1 - NEW OPERATIONS
      • 1
        Isolde & REX from the operation point of view
        REX hardware, software, operation synergy.
        Speakers: Mr Piselli Emiliano (CERN), Mr Siesling Erwin (CERN)
        Slides
      • 2
        Access system LHC-SPS
        Impact of LHC access system on SPS. Is LHC system ready. Can it be trusted. Can WE be trusted. How to operate LHC if access in CNGS?
        Speakers: Mr James RIDEWOOD, Ms Magali Gruwe (CERN)
        Slides
      • 3
        LHC hardware commissioning
        Strategies, improvements, how do we go towards cold machine checkout? how to keep it cold?
        Speaker: Mr Markus Albert (CERN)
        Slides
    • 10:10
      COFFEE
    • SESSION 2 - HARDWARE & INSTRUMENTATION
      • 4
        Technical infrastructure
        Will the new compensator be ready? How to integrate the commissioning in the cold check out? Status of SPS cables. How to avoid unwanted and unannounced interventions on running machines?
        Speaker: Mr Wetton Chris (CERN)
        Slides
      • 5
        Remaining hardware problems in the PS
        Situation of the cables for septum 31 Dump 48: vacuum leak
        Speakers: Mr Oliver Hans (CERN), Mr Simon Mataguez (CERN)
        Slides
      • 6
        Problems and worries on PS side
        BBQ does not work as it should 5 current made (matrices to finished)
        Speakers: Mr Bernard Vandorpe (CERN), Mr Pierre Freyermuth (CERN)
        Slides
      • 7
        Recurrent problems with instruments.
        Frequent reboots of BLM servers. Frequent reboot of orbit servers. General quality of orbit. Gain manipulations (radiation measurements) of BLM’s on extraction channel. TT10 trajectory measurement.
        Speaker: Mr Guy Crockford (CERN)
        Slides
    • 12:20
      LUNCH
    • SESSION 3 - CONTROLS
      • 8
        Still problems to be solved for SPS super cycle changes
        Pulse stop, pulse start. RF on off. Timing tables in LSA. Cleaning ROCS memory. Kicker settings. Can we make two long super cycles resident? Coast : lessons learned in 2007.
        Speakers: Mr Louis Pereira (CERN), Mr Stephane Cettour Cave (CERN)
        Slides
        SPS Super Cycle changes
      • 9
        Controls status of non LSA systems.
        Kicker control, RF and damper, wire scanners, miniscans Java Generic tools for PS
        Speakers: Mr Anthony Rey (CERN), Mr Yannick Riva (CERN)
      • 15:15
        COFFEE
      • 10
        Group matters
    • 17:00
      DRINK