Conveners
3rd Session: The saving prospects in European Labs, projects and machine upgrades - Part 1
- Jim Clarke (STFC)
-
Pierre Vedrine (CEA/IRFU,Centre d'etude de Saclay Gif-sur-Yvette (FR))26/11/2014, 16:00
-
Bernward Krause (DESY)26/11/2014, 16:30During the last ten years a variety of electromagnets has been ordered to upgrade the PETRA accelerator into a synchrotron light source, to build up a new branch at the FLASH accelerator facility and to install the new European XFEL. The talk will give an overview of the ingredients which are necessary for developing and manufacturing magnets. Two septum designs will be presented to...Go to contribution page
-
Gael Le Bec (ESRF)26/11/2014, 17:00Magnets for the ESRF storage ring upgrade (SR2) are being developed. The power consumption of the new ring should be lower than the present ESRF consumption, with much more magnets installed. On top of that, the new lattice must preserve the existing source points in the ID straight sections: longitudinal compactness is a strong constraint. Permanent magnet (PM) and electromagnet (EM)...Go to contribution page
-
Philipp Gardlowski (urn:Facebook)26/11/2014, 17:30GSI Helmholtzzentrum für Schwerionenforschung GmbH operates a unique large-scale accelerator for heavy ions. In the coming years the new international accelerator facility FAIR, one of the largest research projects worldwide, will be built at GSI. In the final extension FAIR consists of several heavy ion accelerator rings, experiment storage rings with up to 1,100 meters in circumference,...Go to contribution page
-
Carmen Tenholt (GSI)26/11/2014, 18:00In order to raise the focusing gradient in case of bunched beam lines, an alternative, iron free, pulsed quadrupole was designed. The transfer channels between synchrotrons as well as the final focusing for the production of secondary beams are possible applications. The construction of this quadrupole is about to be finished and thus it is almost ready to be tested. The quadrupole is...Go to contribution page