ADC Weekly

→ Europe/Zurich
3196/R-023 (CERN)

3196/R-023

CERN

15
Show room on map
Alessandro Di Girolamo (CERN), Andrej Filipcic (Jozef Stefan Institute (SI))


- Reprocessing news -- David South

2012 periodB used, 72 runs, 5fb-1: how much data?
-->
supermerged.HIST ? should they be replicated also to CERN?

Andrej:
we had several issues: several Tier1s full, task assignment blocked.
Shifters were not really aware of "what to do"
Kaushik: shifters cannot know.

announcements when the bulk will start, in particular for Tier1s tape


- Rucio commissioning
- ProdSys2 commissioning


- DC14 outlook
--> Andreu/GDP should get the overview on the needed space and check with DDM

- environment setup issues on (some) grid sites
AleDS: are you proposing to change just the v1r22 version in rel16.6.7? G: yes. ADS: OK. but I would like to be able to rollback. if I copy the directory and I put a copy in the same directory, is it possible?
G: yes, the "install" touch only two files, won't touch the files you copy in the folder.

- testing optimized env setup

Andrej: we have possibility to test on some cluster. I'll check on few of them.

- Investigation into filesize distribution and its effect on disk server performance

 

- log files:
Andrej: we might have a solutions, we didn't enable it. we can move logs files to tape. the other thing is that the other data seems to be too small.
Emmanoueli: not surprising.
Brian: log files on tape.
Andrej: we could in theory merge them before put them on tape.

Simone: what I would suggest is that we take the actions needed to implement the new model, then we relook at the same data, then we see where we are.


- Update on automatic T2D selection
Andrej: before we turn this on we need to reduce the manual.
I would like to see the issues with DDM solved first: if we don't fix the DDM issues then we can't really understand.

can I say: no MCP to cloud FR? yes, Artem has done something on this.
can we start with just 5 Tier2D run in automatic, being these 5 T2D in different clouds? Yes, good idea
 

 

 

 

 

 

 

 

 

 

 

There are minutes attached to this event. Show them.
    • 15:40 → 15:45
      Reprocessing news 5m
      Speakers: Bruno Lenzi (CERN), David Michael South (Deutsches Elektronen-Synchrotron (DE))
      Slides
    • 15:45 → 16:10
      Hot topics
      • 15:45
        Rucio migration - status update 10m
        Speakers: David Cameron (University of Oslo (NO)), Vincent Garonne (CERN)

        Stress test was affected by FTS problems/unreliable monitoring the last two weeks.

        Today load was increased to 200k files/day

        http://dashb-atlas-data-dev.cern.ch/ddm2/#tab=transfer_plots

      • 15:55
        ProdSys2 commissioning - status update 10m
        Speakers: Claire Gwenlan (University of Oxford (GB)), Jose Enrique Garcia Navarro (Instituto de Fisica Corpuscular (ES))
        Slides
    • 16:10 → 16:15
      MC production: update on DC14 5m
      Speakers: Claire Gwenlan (University of Oxford (GB)), Jose Enrique Garcia Navarro (Instituto de Fisica Corpuscular (ES)), Wolfgang Ehrenfeld (Universitaet Bonn (DE))
      Slides
    • 16:15 → 16:25
      environment setup issues on (some) grid sites 10m
      Speakers: Grigori Rybkin (Universite de Paris-Sud 11 (FR)), Grigori Rybkin (Universite de Paris-Sud 11 (FR))
      Slides
    • 16:25 → 16:40
      AMOD/ADCoS report 15m
    • 16:40 → 16:55
      Investigation into filesize distribution and its effect on disk server performance 15m
      Speaker: Brian Davies (Lancaster University (GB))
      Slides
    • 16:55 → 17:05
      Update on T1/T2D Selection 10m
      Speaker: Artem Petrosyan (Joint Inst. for Nuclear Research (RU))
    • 17:05 → 17:10
      AOB 5m
      • network reports (if any)
        - for T2(D)s against T1s - for T1s against T2Ds
        Slides
      • Analysis Availability Reports