Cavity to be installed in cryostat on Friday. All diagnostic systems to be installed until then.
Cooldown foreseen for Monday. Julia, Sarah, Antoine and Tobias will meet at SM18 at 8:00 that day
One OST connector is not delivered yet and the system has to be tested with the cavity. In case of problems readout with oscilloscope is possible
Roberto and Sarah will install the RF system Wednesday morning. The decision is to place the directional couplers behind circulator port 2. Only in case of problems with multiple reflections the setup will be changed