Follow-up meeting (week 32): MBHSM101 planning after cold test
→
Europe/Zurich
927 (CERN)
927
CERN
Description
notes:
Future tasks for 105/101
1. Test assembly of mag. measurement shaft
a. Are the current holes accessible?
b. Do we need different holes
2. WMM of the cold mass
3. Analysis and re-testing of the bullet gauges
4. Cutting the shells in 180 and disassemble
5. WMM on the collared coil
6. Electrical test on the collared coil
a. Higher voltage
b. Maybe risking to destroy the insulation
7. Modifying the instrumented collar packs
a. De-collaring
b. Analysis of the open assembly
c. Re-assembly -> re-collaring
8. Electrical tests after collaring
9. Collared coil on halt waiting for the 2in1
a. 2in1 with 105/101 &106/107
10. WMM in the 2in1