SG1 Final Review comments:
* In the DoW, it is specified that SG will switch from LCG to gLite, when gLite goes into production.
SG tracks the EGEE m/w production releases, with a delay of a few months.
* P-grade portal not SG product, but a SZTAKI product. The P-Grade/SG adaptation is a SZTAKI contribution to SG.
* SZTAKI is incorporating the p-grade portal in the EGEE s/w stack
SG2
* Monitoring tool - add roles/priorities in the use of the clusters - in VOMS. Ongoing.
* Standalone alone SFT. This is a modied SFT to check status of site. This is done but requires some more testing.
* VOMS backup. Ongoing.
IT-GD-OPS
* ROC tickets
* CIC on duty
To-do:
* Check with VF if P. Skala has replied re VV extension.
* VV to give lecture 06 July Grid Monitoring
* PSC 03-04 July
There are minutes attached to this event.
Show them.