PASTE meeting

→ Europe/Zurich
1/1-025 (CERN)

1/1-025

CERN

20
Show room on map
Andrei Tsaregorodtsev
Description
CERN, bat 2 R-030 To join the telephone conference, click here: https://audioconf.cern.ch/call/0165202 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0165202
Production and PASTE Meeting, 17th June 2008, CERN Chair: A.Tsaregorodtsev Minutes: A.Tsaregorodtsev CERN: R.Santinelli, A.C.Smith, M.Bargiotti, A.Tsaregorodtsev, A.Zhelezov Phone: N.Brook, R.Bernet, M.Sapunov, M.Seco, R.Graciani, R.Nandakumar Apologies: S.Paterson, J.Closier, P.Charpentier 0. Ongoing Action List (01) - 06/11/07 - Gianluca, Marianne, Joel -Remedy input data not available and catalog access issues then update ProcDB (07) - 27/11/07 - Zoltan, Elisa, Marianne - Prototype bookkeeping system on volhcb07 (09) - 04/12/07 - Roberto, Marcos, Gianluca - Develop a general service monitoring framework leading to a virtual control room (27) - 08/01/08 - Andrew - Backup DMS services on lxgate34 to allow migration to SLC4, port IntegrityDB to DIRAC3 (55) - 08/04/08 - Marianne - Recover data that failed to be registered in the BK DB (57) - 17/06/08 - Roberto - define the LHCb Workflow Map skeletons (00) - 10/06/08 - DIRAC developers - DIRAC3 (ongoing) Closed actions: (04) - RAL migration (56) - Skeleton Production Manager guide is provided Ongoing actions: (27) - Still 20K entries left in the DIRAC2 Integrity DB. Andrew will go through those and will finally close this DB instance. 1. CCRC operations The current goal of getting the Production DIRAC3 system on the volhcb01 installed and operational by Thursday 19th June is confirmed by Andrei. Ricardo is preparing tools for a seamless services instalation and software updates on the production service machine. 2. Production operations status Roland reported that some sites are failing MC productions and banned. Joel will reinstall the software. Access to LogSE with Roland's credentials is failing because of the wrong mapping in the SE gridmapfile (not using VOMS for this access). Roberto will fix it. Marianne continues to cleanup DC'04 data (~150TB to be cleaned). Fixing the BK for missing registrations is ongoing. 3. Services map, Workflow map Andrei reported about he meeting with Julia and Max about providing LHCb Services Map and Workflow Map facilities. LHCb Services Map is already providing useful information fed through SAM DB and SLS systems with the Grid Services ad DIRAC services views. For the Workflow Map Max will provide instructions how to set up the initial skeleton to Roberto and will authorize him to use Grid Map authoring to populate it with LHCb data and links to the LHCb monitoing pages (ACTION: Roberto). A discussion about the possibility to use the SAM DB visualization tools developed by the Dashboard project. Roberto will provide the selection criteria to choose graphical presentations of the SAM DB data and will pass them to Matvey to incorporate into the DIRAC monitoring pages. 4. DIRAC tasks Marcos reported on the SysLogging clean up for the non nicely written messages that should be fixed by the developers. An agent which will produce a summary of the most frequent messages will be running permanently.
There are minutes attached to this event. Show them.
    • 09:30 → 09:50
      CCRC operations issues 20m
    • 09:50 → 10:10
      Ongoing actions 20m
      (01) - 06/11/07 - Gianluca, Marianne, Joel -Remedy input data not available and catalog access issues then update ProcDB (04) - 13/11/07 - Marianne, Andrew - RAL, FTS job submissions (07) - 27/11/07 - Zoltan, Elisa, Marianne - Prototype bookkeeping system on volhcb07 (09) - 04/12/07 - Roberto, Marcos, Gianluca - Develop a general service monitoring framework leading to a virtual control room (27) - 08/01/08 - Andrew - Backup DMS services on lxgate34 to allow migration to SLC4, port IntegrityDB to DIRAC3 (55) - 08/04/08 - Marianne - Recover data that failed to be registered in the BK DB (56) - 29/04/08 - Roland, Stuart, Joel - Provide Production Manager guide (00) - 10/06/08 - DIRAC developers - DIRAC3 (ongoing)
    • 10:10 → 10:25
      Production status report 15m
      - Report from the Production meeting:
    • 10:25 → 10:55
      Production operations issues 30m
    • 10:55 → 11:25
      DIRAC3 tasks 30m
    • 11:25 → 11:35
      AOB 10m