ETICS Technical Commitee

→ Europe/Zurich
TBD (CERN)

TBD

CERN

Alberto Di Meglio (CERN)
Description
Conference Name: ETICS Technical Committee meeting Recurrence: Every Thursday at 15:30 Dial-in numbers: +41227676000 (Main) Access code: 0126137 (Participant) Participant site: https://audioconf.cern.ch/call/0126137
Minutes
    • 15:30 → 15:35
      Welcome and headcount 5m
    • 15:35 → 16:00
      Status reports 25m
      Highlights of the week, 5 minutes for each WP (NA2, SA1, SA2, JRA1, JRA2)
      • NA2 5m
        • Negotiations ended with success for networking session at ICT 2008 • DNA2.1 ready • Participated to a gird industrial day which took place in Messina. Interest towards ETICS 2 was shown by members of "consorzio COMETA".
      • SA1 5m
        - The first official beta release (1.4.0-0.b1) of the new ETICS Client has been release yesterday morning and announced to the etics-announce list. This beta has been so far tested only on slc4 and it contains the checkout/build commands, most of the list commands and the prepare command of etics-configuration and etics-module. - Work on the beta continues this week with the goal of releasing b2 next week. The program for b2 is to contain the --replace option of the etics-checkout command, the possibility of checking out more than one configuration with the same command and additional editing functionality. - Deployed the SL5 Virtual Machine - Installed etics2 ad etics2-repository, external connectivity requested and operational, backup setup for nodes completed (operating correctly) - WN Definitions: Prepared a webpage listing package installed on different platforms. Work ongoing. http://eticssoft.web.cern.ch/eticssoft/internal/public/VMWareImages/index.html - Read/Write access to AFS space for support units Contacted CERN security team. The access can be granted as long as the use of CERN facilities is complying with e "CERN computing facilities" so they will be bound to the "Computing Rules" (Operational Circular 5) - UNICORE project added, in Juelich added few subsystems and components Started the integration and build from maven Problems encountered with maven repository, solved by SA2 few days ago - Maven study and Maven presentation prepared for Juelich meeting the solution to integrate maven with etics is to create a tool to export import from maven to etics and run it periodically to synchronize the two different systems https://savannah.cern.ch/task/?7002 - glite metrics re-calculation other builds sent to calculate SLOCCounts of gLite for the review https://savannah.cern.ch/task/?7127 - Metrics Disseminator: Unit testing framework integrated and committed. And bug fixing.
      • SA2 5m
        Support --------------- - Still have to prepare GGUS guidelines document (considering also last EMT's request for tracking externals). - Zsolt (4DSOFT) in shift this week. 5 tickets in, 2 solved by 1 first level (6 hours average), three escalated to second level, of which 1 solved, 2 pending. 2 tickets pending for ETICS Experts from past weeks. - Initial content for the portal ready, doing the css stuff is taking more than expected. Top priority now see discussion for USIS. Requirement -------------- - Met JRA1 developers working on org.glite.ce to collect impressions and requirements. Some good idea, general impression of a very low understanding of the system. More in the USIS. Infrastructure Integration Job Submission ------------------------------------------- - Work with Tomcat/Axis continued. We are working packaging the way the final module will be packaged, so that the work is ready when we'll be starting. Next step is going to be implementing the interface using the current NMISubmitter logic. - FZJ started analysis for submitting jobs to UNICORE. New Applications ----------------------------- - FZJ has sorted out the problems with the initial set of UNICORE components in ETICS, now working on the rest of the integration. - VEGA working on the aerospace community's new applications, started working on the problem of securing resources.
      • JRA1 5m
        Nothing to report
      • JRA2 5m
        -This week the focus has been on working the use-cases deliverable. Lots of advances has been done, but the document still has to be improved and additional info to be added. We are going to read more carefully the multinode testing document sent by Lorenzo and to include the necessary info into the deliverable. In the coming days I will deliver it to internal review. -I'm going to update the plugins-metrics document sent by Adriano in the coming days -Implementation of JRA2 services and basic steps of integrating them -as a follow-up of videoconference about multi-node tests/data model held on 11th June (together with SA1 and SA2), SZTAKI clarified and further evaluated the workflow & GUI plans of multi-node support -Technical meeting on 17th June with the developers from Sztaki on integrating their workflow tool in the ETICS in the development environment that we have for JRA2 implementation. The idea is to integrate their tool in the environment that we have and to start testing the tool and to customise to ETICS (JRA2) needs. So according to the incremental approach, installation of an experimenal and interoperable workflow/GUI framework for ETICS-2 portal is in progress. The deadline of this basic integration is the next Friday. - preparation/internal training of recently involved SZTAKI developers is in progress
    • 16:00 → 16:05
      Deliverables status 5m
      Update on deliverables status for PM3
    • 16:05 → 16:15
      New client release status 10m
      Brief summary of the status of the new client release
    • 16:15 → 16:25
      ETICS USIS (User Satisfaction Improvement Strategy) 10m
      Improving user satisfaction about usage of the ETICS services is critical. ETICS is often perceived as slow and difficult to use. This is due to a number of factors: 1) Need for technical improvements in speed and usability 2) Disinformation or third-party rumours 3) General resistance to adopt 'procedures' We need to understand what to focus on and have a plan to address this issue as a combination of technical enhancements, training and dissemination. Where to start?
    • 16:25 → 16:30
      AOB 5m