PASTE meeting

→ Europe/Zurich
1/1-025 (CERN)

1/1-025

CERN

20
Show room on map
Andrei Tsaregorodtsev
Description
CERN, bat 2 R-030 To join the telephone conference, click here: https://audioconf.cern.ch/call/0165202 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0165202
Production and PASTE Meeting, 1st July 2008, CERN Chair: S.Paterson Minutes: S. Paterson CERN: J.Closier, R.Graciani, Z.Mathe, V.Romanovsky, S.Paterson, R.Santinelli, A.C.Smith Phone: R.Bernet, N.Brook, M.A.S.Miguelez, M.Sapunov Apologies: P.Charpentier, A.Tsaregorodtsev 0. Ongoing Action List (01) - 06/11/07 - Marianne, Joel -Remedy input data not available and catalog access issues then update ProcDB (07) - 27/11/07 - Zoltan, Elisa, Marianne - Prototype bookkeeping system on volhcb07 (09) - 04/12/07 - Roberto, Marcos - Develop a general service monitoring framework leading to a virtual control room (55) - 08/04/08 - Marianne - Recover data that failed to be registered in the BK DB (57) - 24/06/08 - Vladimir - Automatic publishing of BDII information in the CS using GOCDB site names (58) - 01/07/08 - Extract list of production role DNs for GGUS ticket submission (00) - 10/06/08 - DIRAC developers - DIRAC3 (ongoing) 1. CCRC operations issues Joel confirmed that the fixes from Stuart allow the simulation to run with the T1s as banned sites. A problem with the ProcessingDB and adding directories was solved by Andrei. There was a suggestion to clean up the data from the CCRC08 phases but it was agreed to retain in in the short term to allow the testing of reconstruction and stripping workflows. Joel asked about how the LFN paths are supplied to the Processing DB, Andy confirmed this is exactly as given by the JobFinalization module. After requesting a scan of volhcb01 it was discovered that the problem of intermittent Matcher failures was related to a closed port. Ricardo requested that Andrew change the importing gfalthr exception printout to a warning. Andrew reported that the failures of the gfalthr module for 1.10.11 are known and a later version of this is in certification. Roberto agreed to check the status of this module. Adria and Ricardo have been testing the new proxy machinery with a test machine in PIC. It is hoped to deploy this on volhcb03 as soon as possible. Nick summarised that his tests of xrootd at NIKHEF were successful for jobs of around 8hrs. Andrew and Nick agreed to perform some stress testing of xrootd versus gsidcap with longer duration jobs. 2. Production Status Report Roberto raised the issue of who should be allowed to submit GGUS tickets. Joel suggested all VOMS production role should be allowed to submit tickets. GGUS supporting VOMS will be available in October but in the meantime Roberto was asked to extract the list of VOMS production role DNs ( ACTION: Roberto ). Joel mentioned that the status at IN2P3 is still unclear as some jobs continue to become stalled. The pending release of dCache to fix this problem is expected next week. 3. DIRAC3 tasks Ricardo raised the question of whether Launchpad should be used, it was suggested that the developers evaluate the usage of LaunchPad and check whether it could feasibly be installed at CERN. 4. AOB None
There are minutes attached to this event. Show them.
    • 09:30 → 09:50
      CCRC operations issues 20m
    • 09:50 → 10:10
      Ongoing actions 20m
      (01) - 06/11/07 - Gianluca, Marianne, Joel -Remedy input data not available and catalog access issues then update ProcDB (07) - 27/11/07 - Zoltan, Elisa, Marianne - Prototype bookkeeping system on volhcb07 (09) - 04/12/07 - Roberto, Marcos, Gianluca - Develop a general service monitoring framework leading to a virtual control room (55) - 08/04/08 - Marianne - Recover data that failed to be registered in the BK DB (57) - 24/06/08 - Vladimir - Automatic publishing of BDII information in the CS using GOCDB site names (00) - 10/06/08 - DIRAC developers - DIRAC3 (ongoing)
    • 10:10 → 10:25
      Production status report 15m
      - Report from the Production meeting:
    • 10:25 → 10:55
      DIRAC3 tasks 30m
    • 10:55 → 11:05
      AOB 10m