Beam Physics Meeting

→ Europe/Zurich
1/1-025 (CERN)

1/1-025

CERN

20
Show room on map
Participants: * K. Elsener, I. Ahmed, E. Adli, D. Schulte, F. Antoniou, B. Jeanneret, T. Lefevre DS: * In two weeks we will have a review of what is needed for the Beam Instrumentation Templates BJ: * Presented "Specification of Vacuum System of the Drive beam long transfer line" - BJ comments: specification should not contain the physics or justification, just the specification - a spec must always conform to the "project breakdown structure (PBS) - this spec: based on BI instrumentation spec docs - DS comments: not clear if tune shift/spread is a problem for a transfer line (unlike a ring) [so less emphasize should be put on this] - KE: r = 10cm all along beam line? JB: yes. TL: is this the min? JB: yes. EA, 28-may-2008
There are minutes attached to this event. Show them.
The agenda of this meeting is empty