PASTE meeting

→ Europe/Zurich
1/1-025 (CERN)

1/1-025

CERN

20
Show room on map
Andrei Tsaregorodtsev
Description
CERN, bat 2 R-030 To join the telephone conference, click here: https://audioconf.cern.ch/call/0165202 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0165202
Production and PASTE Meeting, 29th July 2008, CERN Chair: A.Tsaregorodtsev Minutes: S. Paterson CERN: M.Bargiotti, A.Casajus, P.Charpentier, Z.Mathe, S.Paterson, R.Santinelli, V.Romanovsky, M.Sapunov, A.C.Smith, A.Tsaregorodtsev Phone: R.Bernet, N.Brook, R.Nandakumar Apologies: (07) - 27/11/07 - Zoltan, Elisa - Prototype bookkeeping system on volhcb07 (09) - 04/12/07 - Roberto, Marcos - Develop a general service monitoring framework leading to a virtual control room (57) - 24/06/08 - Vladimir - Automatic publishing of BDII information in the CS using GOCDB site names (59) - 22/07/08 - Ricardo - Add ldap python modules to DIRAC python distribution (61) - 22/07/08 - Andrei - Investigate request generation problems in the workflows (62) - 22/07/08 - Roberto - Check instabilities in production gLite WMS instances (63) - 22/07/08 - Roberto - Develop DIRAC3 script for adding new users to the VO (64) - 29/07/08 - Philippe, Andrew - Prepare SRMv1 retirement migration plan (00) - 29/07/08 - DIRAC developers - DIRAC3 (ongoing) Completed Actions: Done - (58) - 15/07/08 - Marianne - Clean up extra 3M events for production 2146 Production operations actions will be moved to the Monday and Thursday meetings, these include: OPS - (01) - 06/11/07 - Marianne, Joel - Remedy input data not available and catalog access issues then update DIRAC2 ProcDB OPS - (55) - 08/04/08 - Marianne - Recover data that failed to be registered in the BK DB OPS - (60) - 22/07/08 - Vladimir - Develop tools to check stalled jobs for outputs and clean up as required 1. Production Issues - Action(01) - ProcDB clean-up Nobody was available to comment further on this action. - Action(07) - Prototype Bookkeeping Zoltan is waiting for Elisa to update the new productions to the new schema of the prototype bookkeeping. A GUI is being developed for the processing. Zoltan commented that the interfaces are synchronous for the insertion in the database. - Action(09) - Virtual Control Room Roberto is converting a sensor from Raja to report the status of the VO-boxes. Discussions are ongoing with Marcos to establish sensors based on logging information. Philippe raised that the SE testing reports to SAM are declaring many Tier-1s as unavailable erroneously. Roberto agreed to compile a twiki page to explain the issues resulting in test failures, e.g. GridKa firewall issue. - Action(55) - BK Registration Failures There are ~4.5K remaining errors in the old BK. Currently the BK manager must be restarted weekly and this is being investigated. The 4.5K remaining seemingly have no ancestor files available, there was a suggestion to scrap this data from the BK, LFC and storage. Some discussion regarding the problematic Castor tape. - Action(57) - Automatic publishing of BDII information in the CS - Action(58) - Clean up extra 3M events for production 2146 We agreed to keep these extra events for the physicists so no cleaning required. - Actions (57), (59) - Add ldap module to distribution Ricardo should comment later today on the status of this. - Action(62) - Evaluate gLite WMS instances Temporarily using one additional WMS instance from ATLAS for testing. Adri reported that another instance at CNAF has now become usable. The LCG IS should be cleaned to convey the gLite WMS instances that we have and are usable. Roberto conveyed that the possibility exists to convert our LCG RB instances to gLite WMS but we agreed to wait until the DIRAC2 retirement for solving this. - Action(63) - DIRAC3 scripts for adding new users to the VO + CS Roberto mentioned a prototype of this script was made available in bash but the DIRAC python script is pending. Stuart reported that productions 37 and 38 were extended in DIRAC3 for the following requests from the CP WG and these are running fairly smoothly. Vladimir reported an issue with some jobs stalling at around 4am and this is pending investigation. One important request was for separating Production and Development gLite WMS's to avoid destructive interference, this was already performed by Adri. Due to the 'has replica' flag not being conveyed to the Bookkeeping for productions 37 & 38 this will be updated by hand. The BK catalog plugin should be carefully checked to ensure that this corrective action is not required in the future. 2. DIRAC3 Tasks - DIRAC release The development release now includes the new proxy framework (embedding DIRAC groups inside the proxy). There is now a proxy management system with a service to update the proxies. OpenSSL is no longer required on the command line, pyGSI is now used. Delegation is used everywhere and we are now in full compliance for the pilot WG document. Combined software installation will also be deployed with the release and this will enable SAM test jobs to run in the production system. The Bookkeeping replica registration will also be added to the release but this is pending the DIRAC installation on volhcb07. After the release it was agreed to update the checklist. - Service volhcbXX hosts usage There are 4 new volhcbXX hosts, 08 - 11. Two of these will be dedicated to the DIRAC3 Production system (08, 09). It was agreed to benefit from this experience to define the procedure for migrating the production system. The machines to be retired are lxgate34 (Done), lxgate03 (pending production release for SAM jobs), volhcb07. volhcb03 should also be retired so the DIRAC3 development system can be moved to volhcb01 and 02. The prototype bookkeeping will move to volhcb10 volhcb11 will be used for creating a hot-swap backup of the WMS. - WMS testing policy There was some discussion on the testing policy. In the future any testing should be announced and scheduled for periods when no ongoing production requests are pending. 3. AOB Raja raised the question about the retirement about the DIRAC2 user system. Retirement of SRMv1 is pending the retirement of DIRAC2 so this becomes important. Stuart mentioned that the delay to the development release has put any Ganga developments on hold but this should get back on track in the coming days. A strategy for the SRMv1 retirement will be discussed offline and proposed in the coming weeks. ( ACTION: Philippe, Andrew )
There are minutes attached to this event. Show them.
    • 09:30 → 09:50
      CCRC operations issues 20m
    • 09:50 → 10:10
      Ongoing actions 20m
      (01) - 06/11/07 - Marianne, Joel -Remedy input data not available and catalog access issues then update DIRAC2 ProcDB (07) - 27/11/07 - Zoltan, Elisa - Prototype bookkeeping system on volhcb07 (09) - 04/12/07 - Roberto, Marcos - Develop a general service monitoring framework leading to a virtual control room (55) - 08/04/08 - Marianne - Recover data that failed to be registered in the BK DB (57) - 24/06/08 - Vladimir - Automatic publishing of BDII information in the CS using GOCDB site names (58) - 15/07/08 - Marianne - Clean up extra 3M events for production 2146 (59) - 21/07/08 - Ricardo - Add ldap python modules to DIRAC python distribution (60) - 21/07/08 - Vladimir - Develop tools to check stalled jobs for outputs and clean up as required (61) - 21/07/08 - Andrei - Investigate request generation problems in the workflows (62) - 21/07/08 - Roberto - Check instabilities in production gLite WMS instances (63) - 21/07/08 - Roberto - Develop DIRAC3 script for adding new users to the VO (00) - 21/07/08 - DIRAC developers - DIRAC3 (ongoing)
    • 10:10 → 10:25
      Production issues 15m
      - Report from the Production meeting - Separating Production and Development gLite WMS's - gLite WMS authorization problems
    • 10:25 → 10:55
      DIRAC3 tasks 30m
      - DIRAC release - WMS testing policy, separating Production and Development gLite WMS's - Service volhcbXX hosts usage - Failover mechanism tests
    • 10:55 → 11:05
      AOB 10m