EHN1 Smoke Extraction Meeting Notes
March 5, 2015 @ CERN
Present : Fabio Corsanego, Roberto Bozzi, Mats Wilhelmsson, Martin Manfredi, Natascha Lopez-Hernandez, Jose Gascon, Adrian Fabich, Ilias Efthymiopoulos
Agenda: https://indico.cern.ch/event/378993/
Discussion
Current considerations should only impact on the EHN1-extension part, no consideration on existing part yet. Whatever soluiton is found for this, could be deployed in a later stage to the existing building as part of the consolidation program.
What presently foreseen in the extension comes from what available in the existing buidling. Reminder, what is avaialble In the existing building:
- The are side openings foreseen with their upper edge is about 2 m from the roof, tbc by GS/SE.
- These side openings were/are used for smoke extraction and ventilation (e.g. cooling in summer).
- There are are dedicated openings in the roof for gas extraction, connected to an active ventilation system.
For the extension, what is presently foreseen is:
- Overall the roof is higher than the existing building and has an inverted-V shape (the existing building has a W-shape).
- The distance for the side openings from the roof is intended to be the same as in the existing buidling, however as the roof has a different shape their position needs to be verified, and at the end may be higher with respect to the floor compared to the existing buidling.
- The basic approach is a passive smoke extraction, which is according to today’s legislation (IT 246 - see attached e-mail from Fabio). It should be avoided mixing passive and active smoke extraction systems, which would require a sophisticated layout and make the system less reliable. With the passive system in the existing building, also the extensions should have a passive smoke extraction.
- The inlet capacity for the passive air flow should be verified. It might be required increasing the material door(s) in the lower part of the building.
- We keep the dedicated gas extraction openings in the roof (6 foreseen). They would be needed for the Argon extraction.
- Natacha confirmed the walls for the extension are made of SS/rockwoool sandwitch.
Additional documentation:
- e-mail from Fabio Corsanego on the regulations to apply for the smoke extraction
- e-mail from Eduard Feldbaumer on RP clearence for the air extraction from EHN1
Actions:
- Ilias will put all norms and norm e-mails into the agenda
- EN/CV (Roberto) will conduct an analysis of the ventilation and smoke extraction schemes for the extension and come back with proposal for the size and position of existing and new ventilation openings, including the air inlet.
- EN/CV will determine the size of the platforms required for ventilation units.