EFIG Meeting

US/Eastern
Other Institutes

Other Institutes

Joseph David Lykken (Fermi National Accelerator Lab. (US))
Description
9 March 2015 meeting of the Experiment-Facilities Interface Group
Participants
  • Andre Rubbia
  • David Lissauer
  • Elaine McCluskey
  • James Allen Stewart
  • Jeffrey Dolph
  • Jim Strait
  • Joseph David Lykken
  • Mark Andrew Thomson
  • Marzio Nessi
  • Michael Lindgren
    • 1
      Minutes from previous meeting
      Minutes
    • 2
      Discuss dimensions of the option 5A enclosures (Tracy)
      drawings
    • 3
      Report of review of detector installation and commissioning schedule (Jim Stewart and André)
      Slides
    • 4
      Report on ES&H considerations for option 5A (Mike Andrews)
      document
    • 5
      Report on determining the cost of option 5A (Josh)
      Slides
    • 6
      Discuss planning, what can be ready when, for Director’s review and DOE review (Elaine and Tracy)
    • 7
      Decide whether to proceed on providing specs for option 5A to the A&E firm