Reco parameters:
- Do not reconstruct the run if we don't know the magnetic field or if the RMS
of the measurements with Hall probes is too large.
- Need for HLT-specific parameters.
- AliTPCEventInfo from the RCU trailer is completely separated from
AliEventInfo.
- AliReconstruction selects the reco. param and propagates
it to the detector reconstruction. AliEventInfo is propagated to the
detectors and permits additional algorithmic choice.
Release:
- All observed problems are fixed.
+ FPE in the calculation of the material budget in ITS because the return
values of the functions were not checked.
+ Numerical instability in AliVertexerTracks.
+ Missing protections in AliVertexerZ.
+ the cov. matrix contained huge values because some return values in the
track propagation were not checked in TRD. The tracking of low momentum
particles is stopped when the momentum is below given value (10MeV).
- Request: we have to provide possibility to exclude the TRD information from
the final refit inward.
Overlaps:
- New checks were performed and ~450 new overlaps discovered. This may postpone
the first physics production.
- The new tool will be availabe in the Root trun this evening.
- The full misalignment has to be checked also for overlaps.