For the 160 MeV beam injection into the Proton Synchrotron Booster (PSB), several magnets need to be changed in the Booster Injection (BI) transfer line to cope with the increased beam energy. Also, considering the age and condition of the remaining magnets and profiting from the occasion the change of the remaining magnets is proposed for consolidation reasons.