1st ENH1 Detector Integration Meeting
Minutes meeting 18-June-2015 M.Nessi
1) detector integration
- before changing the position of the beam, lets verify the cryostat dimensions
- WA105 platforms support
- define requirements on the opening of the WA105 clean room and the dimension of the room
- beam line installation time 9 months
- open questions on slide 21
- will be drawings accessible
2) cryogenics layout
- define the amount of pumps needed for the Argon evacuation pumps
3) beam layout
- next meeting: define the help is needed from outside CERN to instrument the beam line
4) detectors installation
- WA105 top caps to be optimised in size. Requires further discussions
5) crates and power needs
- WA105 requirements done + slow control
- Dune SP : first estimations presented
6) integration
- cryo to give dimension of units above the cryostats