Aim: - to discuss ‘LIU / HL-LHC’ interface subjects - to discuss possible improvements (strategies, equipment improvements, schedule, beam parameters) beneficial for both projects - to clarify misunderstanding and identify parameter mismatch - to update parameter tables if needed - to ensure coherency of timeline and decisions between the two projects (e.g. ions)
    • 14:30 14:40
      Session 1 – C&S review outcome 10m
      Speakers: Giovanni Rumolo (CERN), Oliver Bruning (CERN)
      • Protons: Updates on LIU baseline and options (incl. staged implementation), schedule 2m
      • Protons: Updates on HL-LHC baseline and options (incl. staged implementation), schedule 2m
      • Ions: Updates on HL-LHC baseline and options (incl. staged implementation), schedule 2m
      • Ions: Updates on LIU baseline and options (incl. staged implementation), schedule 2m
    • 14:40 14:50
      Session 2 – 2015 operational experience 10m
      Speakers: Hannes Bartosik (CERN), Mike Lamont (CERN)
      • Linac4 status – any changes for HST, LIU parameters, schedule? 2m
      • Proton beam operation and MD in the injectors – outcomes for LIU and HL-LHC? 2m
      • 25 ns operation in the LHC – consequences for the LIU and HL-LHC? 2m
      • Ion operation in the injectors 2m
    • 14:50 15:00
      Session 3 – Shutdown planning 10m
      Speakers: Beniamino Di Girolamo (CERN), Katy Foraz (CERN)
      • Work to be done in Run2 YETS and EYETS, including de-cabling, for LIU and HL-LHC 2m
      • Work to be done in LS2 (LIU and HL-LHC anticipated), and LS2 length 2m
      • Work to be done in LS3 (LIU delayed and HL-LHC) and LS3 length 2m
      • Overview of other projects including CONS 2m
    • 15:00 15:10
      Session 4 – Beam tests in injectors needed for LIU and HL-LHC 10m
      Speakers: Rhodri Jones (CERN), Verena Kain (CERN)
      • Joint LIU / LH-LHC MD needs in the injectors 5m
      • Equipment installation needed from CERN projects in the injectors: 5m
        o Crab-in-SPS: needs, integration studies, timelines o Collimators in SPS: needs, timelines o Instrumentation in SPS
    • 15:10 15:20
      Session 5 - Other possible non-baseline improvement towards reaching target goals (beam parameters and luminosity) and implications 10m
      Speakers: Brennan Goddard (CERN), Gianluigi Arduini (CERN)
      • LIU: PS, SPS impedance reduction, other beam schemes, new feedback systems 5m
      • HL-LHC: RF 200/800 MHz options and bunch length for HL-LHC, measures against transverse emittance blow up in LHC 5m