Choose timezone
Your profile timezone:
Present: Marcin, David L. Graeme, Peter, Bill (R), David A.
Bill and David A.
o CMS will pick up the fix of Axel
o 6.04 is delayed: if everything works it will be picked up in a month or so
Marcin
o 6.02 and 6.04 in the builds: nothing wrong there
o First ROOT6 build 20.6.0.2 sent out for physics validation. About 2 weeks to collect all the results (jobs need to run)
Peter
o Looking into two strategies for the memory reduction: plugin removal and big pch.
o Sent the massif report to Axel
Graeme
o Gcc 5.1 can be configured to use the old abi and everything will work. In a month we will know what clang will do.