How to get reliable PSB sieve and PS&SPS dumps for 2006?

13 Jan 2005, 15:40
15m
503/1-001 - Council Chamber (CERN)

503/1-001 - Council Chamber

CERN

162
Show room on map
Shutdown Activities in 2005 Session 2 - Shutdown Activities in 2005

Speaker

Roberto Losito (AB-ATB)

Description

During the last two years of operation the PS internal dumps and the PSB sieve showed a significant diminution in reliability. The availability of one PS dump and of an operational spare is the prerequisite for some modes of operation (e.g. nTOF in parasitic mode of East hall). The PSB sieve is absolutely required for the production of the pilot LHC beam. In the SPS the high energy beam dump absorber (TIDVG) presents signs of beam damage which reduce the mechanical aperture available for the beam (in particular the high intensity ones). The current status of this beam intercepting devices, operational issues and the planned renovations in 2005 will be discussed. A schedule about the future transfer of responsibility for the stepping motors for all the collimators of the PS&SPS complex to the ATB group will be given.

Author

Presentation materials