Speaker
Mr
Thomas Zickler
(CERN)
Description
The PS main magnet renovation program comprises two phases in which all PS main
magnet units will be refurbished. Phase 1 will take place during the long PS shut
down in 2005 and foresees the renovation of 40 magnets. The actual state of all
magnets has been evaluated and analyzed in order to identify the weakest magnets.
These magnets will be removed from the PS tunnel, completely dismantled and equipped
with new main coils and new pole-face-windings. This presentation gives an overview
about the magnet evaluation method and the manufacturing status of the new
components. Aspects related to refurbishment, test and re-installation procedures
will be discussed.
Author
Mr
Thomas Zickler
(CERN)