13–14 Jan 2005
CERN
Europe/Zurich timezone

Can we afford to re-start the SPS in 2006 without multicycling?

14 Jan 2005, 10:50
20m
503/1-001 - Council Chamber (CERN)

503/1-001 - Council Chamber

CERN

162
Show room on map
Preparation of Restart in 2005-2006 Session 3 - Preparation of Restart in 2005-2006

Speaker

Bertrand Frammery (CERN)

Description

From 2006 onwards, LHC studies, CNGS and other fixed target physics programs will compete for beam. Besides, the timing equipment currently driving the SPS cycling is not compatible with PS Complex and with the future LHC cycling flexibility. Multicycling the SPS is a solution for both problems (together with speeding up the basic cycling period to 0.9s) and a firm decision must taken on this possibility. The talk will present the motivations for multicycling the SPS from 2006, then it will give details on the changes to be made in the equipment together with their cost in money and manpower. As a conclusion, the expected benefits for both physicists and operation will be presented.

Author

Presentation materials