09:00
|
Welcome address by P. Ciriani
- Mr
P. Ciriani
(CERN)
|
09:10
|
session 1
(until 10:50)
|
09:10
|
Overview of important design parameters and technologies. Status of LHC machine
- Dr
R. Schmidt
|
09:50
|
GENERAL SERVICES INSTALLATION: ASSESSMENT OF THE PLANNING AND COORDINATION IN THE FIELD
- Mr
S. Grillot
(CERN)
|
10:10
|
UNDERGROUND LOGISTICS
- Mrs
K. Foraz
(CERN)
|
10:30
|
COORDINATION DE LA SECURITE DE L’INSTALLATION DU LHC ET DE SES EXPERIENCES
- Mr
M. VADON
|
10:50
|
--- break ---
|
11:10
|
session 2
-Mr
P. Ciriani
(TS)
(until 12:30)
|
11:10
|
LOGISTIQUE DE TRANSPORT DE LA QRL : DE LA THEORIE A LA REALITE SUR LE TERRAIN
-
S. Prodon
(CERN) Mr
J. Sakkinen
|
11:30
|
CRYO-MAGNETS TRANSPORT VEHICLES AND TRANSFER TABLE SETS
- Mr
Kurt Artoos
(CERN)
|
11:50
|
MAINTENANCE DES EQUIPEMENTS DE TRANSPORT POUR L’INSTALLATION DES CRYO-AIMANTS DANS LE TUNNEL LHC
- Mr
J.-M. Chevalley
(CERN)
|
12:10
|
INSTALLATION OF LHC COLD BOXES: STATUS
- Ms
C. Bertone
(CERN)
|
|
09:00
|
Session 5
-Mr
K. Potter
(TS-HDO)
(until 10:40)
|
09:00
|
COORDINATION AND MANAGEMENT OF THE LHC EXPERIMENTAL AREAS
- Mr
E. Tsesmelis
|
09:20
|
RADIATION TOLERANCE ASSURANCE OF TECHNICAL EQUIPMENT IN THE LHC & RADIATION MONITORING FOR TECHNICAL EQUIPMENT AT THE LHC
- Mr
T. Wijnands Mrs
A.L. Perrot
|
09:50
|
REPAIR ACTIVITIES ON THE LHC CRYOGENIC DISTRIBUTION LINE IN CHARGE OF TS/MME
- Mr
S. Atieh Mr
A. Cherif
|
10:20
|
THE LHC ACCCESS SYSTEM LACS AND LASS
- Mr
P. Ninin
|
10:40
|
--- break ---
|
11:00
|
Session 6
-Mr
V. Vuillemin
(TS-MME)
(until 12:20)
|
11:00
|
EXPERIENCE WITH THE PRODUCTION AND TESTING OF THE PROTOTYPES OF LHC COLLIMATORS
- Mr
A. Bertarelli
|
11:20
|
RF CONTACTS FOR TCS COLLIMATORS
- Mr
S. Calatroni
|
11:40
|
THE CLIC ALIGNMENT STUDIES: PAST, PRESENT AND FUTURE
- Mrs
H. Mainaud
|
12:00
|
ACTIVITES MME POUR CLIC, CARACTERISATION DE MATERIAUX NON CONVENTIONNELS ET LEUR MISE EN ŒUVRE
- Mr
G. Arnau Izquierdo
|
|
09:00
|
Session 9
-Mr
C. Hauviller
(TS-IC)
(until 10:40)
|
09:00
|
Introduction de procedures qualite au BE electronique
- Mrs
B. MAGNIN
(TS-DEM)
|
09:20
|
ELABORATION ET GESTION DES PLANS D’INSTALLATION
- Mr
J-P. Corso
(CERN)
|
09:40
|
CATIA V5 AT CERN
- Mr
T. Hakulinen Mr
Y. Boncompagni
|
10:00
|
DE L'ETUDE A LA PRODUCTION D'ENSEMBLES: LA GESTION DES PLANS DFB
- Mr
C. Delamare Mr
R. Folch
|
10:20
|
L’ONDULATEUR SUPRACONDUCTEUR 5T UNE REALISATION CLEF EN MAIN CERN
- Mr
T. Renaglia
|
10:40
|
--- break ---
|
11:00
|
Session 10
-Mr
C. Hauviller
(TS-IC)
(until 12:20)
|
11:00
|
BUREAU D’ETUDES CV
- Mr
C. Martel
|
11:20
|
Discussion Design office
|
|
12:30
|
--- Lunch ---
|
14:00
|
Session 3
(until 15:40)
|
14:00
|
LHC INSTALLATION PLANNING
- Mr
S. Weisz
(CERN)
|
14:40
|
CERN CONTROL CENTRE (CCC) – DE LA CONCEPTION A L’EXECUTION
- Mr
M. Poehler
|
15:00
|
WHAT DO WE EXPECT FROM THE CCC: A VISION FOR TS
- Mr
M. Batz
|
15:20
|
TECHNICAL INFRASTRUCTURE MONITORING FROM THE CCC
- Mr
J. Stowisek Mr
S. Roy
|
15:40
|
--- break ---
|
16:00
|
Session 4
-Mr
K. Potter
(TS-HDO)
(until 18:00)
|
16:00
|
INSTALLATION OF LHC EXPERIMENTAL AREAS
- Mr
F. Butin Mr
J. Osborne Mr
S. Evrard Mr
D. Lacarrere
|
16:40
|
RESOURCE LOADED PLANNING FOR ALICE
- Mr
M. Gastal
|
17:00
|
COORDINATION DES INSTALLATIONS ET SURVEY DANS LES ZONES EXPERIMENTALES : IMPERATIFS DE COLLABORATION ET DE FLEXIBILITE
- Mr
J.C. Gayde
|
17:20
|
SERVICES FOR A LARGE WARM SPECTROMETER MAGNET: THE LHCB DIPOLE MAGNET
- Mr
J. Ridewood
|
17:40
|
COMMISSIONING AND FIRST YEAR OPERATION OF THE LHC EXPERIMENTS
- Dr
D. Macina
|
|
12:20
|
--- Lunch ---
|
14:00
|
Session 7
(until 15:50)
|
14:00
|
NEG COATING OF THE NON-STANDARD LSS VACUUM CHAMBERS
- Mr
P. Costa Pinto
|
14:20
|
LE SOUDAGE DE L’ALUMINIUM ET DE SES ALLIAGES
- Mr
G. Favre
|
14:40
|
LE BRASAGE CERAMIQUE / METAL
- Mr
S. Mathot
|
15:00
|
THE DEVELOPMENT OF THE FABRICATION PROCESS OF "LOW MASS" CIRCUITS
- Mr
R. DE OLIVEIRA
(TS-DEM)
|
15:20
|
QUALITE DE LA CHAINE DES DONNEES SURVEY ET SYSTEME DE COORDONNEES CERN
- Mr
C. Podevin Mr
M. Jones
|
15:50
|
--- break ---
|
16:10
|
Session 8
-Mr
T. Pettersson
(TS-CSE)
(until 18:10)
|
16:10
|
SAFETY COMMISSION DATABASES SUPPORT
- Mrs
E. Sanchez-Corral Mr
S. Petit
|
16:30
|
MIGRATION OF MP5 TO D7I
- Mr
P. Martel
|
16:50
|
A FUTURE FOR COMPUTATIONAL FLUID DYNAMICS AT CERN
- Mr
M. Battistin
|
17:10
|
2001-2006 EVOLUTION DES INFRASTRUCTURES TECHNIQUES DU CENTRE DE CALCUL EN VUE DU LHC
- Ms
A. Funken
|
17:30
|
NEW RULES ON LEGIONELLA PREVENTION
- Ms
N. Bangert
|
17:50
|
NOUVELLE METHODE DE MANUTENTION DES AIMANTS PS EN VUE DU SHUTDOWN 2005
- Mr
P. Minginette
(CERN)
|
|
12:20
|
--- Lunch ---
|
14:00
|
Session 11
-Mr
T. Pettersson
(TS-CSE)
(until 15:40)
|
14:00
|
THE ROLE OF DEM AT CERN
- Mr
E. Van der Bij
|
14:20
|
BILAN DU CONTRAT RENCO
- Mr
R. Principe
|
14:40
|
A SECOND THYRISTOR CONTROLLED STATIC VAR COMPENSATOR FOR SPS
- Mr
K. Kahle
|
15:00
|
BILAN DES BATIMENTS
- Mrs
C. Colloca
|
15:20
|
LOIS DU TRAVAIL APPLICABLES SUR LES SITES CERN, NOTAMMENT LE SITE DE MEYRIN
- Mrs
L.A. Lopez-Hernandez
|
15:40
|
--- break ---
|
16:00
|
Conclusions
(until 17:30)
|
18:30
|
SOCIAL ACTIVITIES
(until 22:30)
|
|