Financial implications of a hypothetical re-profiling of Phase I of the project over 4 years. This is a first look at what could be required if the first physics data was to arrive only in 2007.
Speaker:
Les Robertson
16:20
Preparation for a proposal on trans-Atlantic Grids for LHC to the SC2 in February, and thence to the InterGrid meeting on 17 Feb in Toronto20m
16:25
Position on the Reference Testbed and Converged LHC Requirements20m