After recovering from a vacuum leak in the interaction region beam pipe, KEKB resumed operation in January and is running well. Members of the Belle and KEKB groups have started the design of a major luminosity upgrade (Super KEKB) aimed at a luminosity of 1035 - 1036 cm-2 s-1. This talk will cover the recent status of Belle/KEKB running, the latest physics results and plans for the Super KEKB upgrade - physics, detector and accelerator issues.