CERN conference system: +41 22 767 7000
Ask for code: EGEE-JRA4
Organized by: Javier Orellana
PENDING ACTIONS:
================
ACTION(Sophie): Ask to QA group about how this process about gathering of requirements can be managed.
ACTION (All): read the documents for the description of the ARDA architecture and the minutes for JRA1 – JRA4 minutes. Can be found at the JRA4 website.
ACTION (All): Read requirement documents from NA4 (see in the JRA4 webpage).
ACTION (Nicolas, Sophie, Afrodite): to circulate operation issues to discuss in this meeting (SA1), gathered from requirement study, and Javier will build the agenda.
ACTION (Loukik): review the MJRA4.1 document and contribute to it
ACTION (Afrodite): complete the template with an specific example of requirement and use case to illustrate how to write them taken from the GHPN document.
AGENDA
======
1.Approve of minutes.
2.Managerial Issues
3.Preparation for the JRA4 F2F Meeting
4.Progress update
Network Performance Monitoring
MJRA4.1:
“Study of Performance Standards” (S-T1.1.1)
“Selection of the appropriate metrics” (S-T1.1.2)
MJRA4.2 (T1.2) :
“Requirements and use case for end users” (S-T1.2.1)
“Requirements and use case for operations” (S-T1.2.2)
Bandwidth Allocation and Reservation
“Analysis of existing Interfaces” (S-T2.1.1) and
“Survey of software available today” (S-T2.1.2)
“Requirements and Use Cases ” (S-T2.1.3) and
“Interface with Global Resource Manager” (S-T2.1.4)
IPv6 uptake
DJRA4.3 (T3.1)
“Assessment on IPv6 implication” (S-T3.1.1)
5.Architecture
6.Coordination with external activities
JRA1
NA4:
Joint meeting on 15-16 July (in Catania).
Agenda: http://agenda.cern.ch/fullAgenda.php?ida=a041952
JRA3
SA1
GGF-GHPN
R-GMA
7.Next meetings:
Next conference call: 25 July (if JP can run it) or 9 July
8.AOB