1) Round table on the TNLC document.
2) Network requirements:
- from EGEE point of view.
- from NRENs point of view.
3) Collaboration EGEE/NRENs
- Network provision follow-up.
- NOC operation survey (SA2 task on June-July-August)
- Trouble Ticketing Systems study (GOC & NOC)