11–13 May 2005
CERN, Prévessin
Europe/Zurich timezone

Power Interlock Controllers: WIC

12 May 2005, 15:30
10m
864-1-C02 (CERN, Prévessin)

864-1-C02

CERN, Prévessin

Speaker

Robert Harrison (AB-CO)

Description

On reception of the hardware for each Warm Magnet Interlock Controller (WIC) installation, the system will be constructed in the lab. This will facilitate testing of the hardware and the correct operation of the systems software and functionality. All input signals will be stimulated and the expected response of the system and the output for the respective power converter can then be verified. Each system is then installed in the LHC tunnel at the required location, and the connections made to each Magnet and Power Converter. The system is re-tested with the actual hardware connected, according to previously defined test procedures. Additional tests of the field- bus links and the deployed PLC components will complete the commissioning procedures and the warm magnet interlock system is declared operational and ready for the connection of power cables and the following powering procedures.

Author

Presentation materials