Speaker
Felix Rodriguez Mateos
(TS-HDO)
Description
The main topic of the talk is the validation for operation of the
electrical circuits as a single system. In the light of the previous
talks and the hardware commissioning documentation, each step of the
powering tests will be revisited and their time durations justified.
Risks, failure scenarios, and foreseen fall back solutions will be
presented.
The requirements and priorities for (i) the software applications to
run the tests, (ii) the necessary Post-Mortem and graphical user
interfaces, (iii) the analysis tools and (iv) the automated
procedures which will be needed to conduct the commissioning of the
electrical circuits safely and in time will be discussed.
Author
Felix Rodriguez Mateos
(TS-HDO)