From Hardware Commissioning to Machine Checkout

13 May 2005, 10:20
30m
864-1-C02 (CERN, Prévessin)

864-1-C02

CERN, Prévessin

Speaker

Simon Baird (AB-OP)

Description

Three phases of getting the complete LHC from the Hardware commissioning into a full Machine Checkout have been outlined in the last LHC Chamonix Workshop. These are: 1. Cooldown and Closure of the complete machine 2. System and Equipment tests per sector 3. Complete Machine cycles The Hardware Commissioning team is responsible for the Hardware Commissioning itself and AB/OP will be responsible for the phase 3. However, for phases 1 & 2, the responsibility is less clear. The aim of this presentation is to answer the following questions. Or at least show where clearer answers are needed. • During Hardware Commissioning, which cycles will have been tested? And to what “beam energy”? o Can a sector be considered as “ready for beam” immediately after the Hardware Commissioning? • Who is responsible for the sectors between the end of Hardware Commissioning and the start of the Machine Checkout (during phases 1 & 2 above)? o What happens to a sector after the Hardware Commissioning and before the Machine Checkout? o Who “re-commissions” these sectors to get them ready for the Machine Checkout?

Author

Presentation materials