Conveners
Electrical circuits and magnets (warm and cold) (cont')
- Frederick Bordry (AB-PO)
Markus Zerlauth
(AB-CO)
12/05/2005, 16:05
slides
Before installation in the tunnel, the powering interlock controller
(PIC) will be completely assembled and tested on all its
functionality on the surface. One powering subsector in the tunnel
will be managed by one dedicated powering interlock controller (two
in the case of the long arc cryostat). For this, a dedicated test
system is able to emulate all signals that the later on...
Felix Rodriguez Mateos
(TS-HDO)
12/05/2005, 16:35
slides
The main topic of the talk is the validation for operation of the
electrical circuits as a single system. In the light of the previous
talks and the hardware commissioning documentation, each step of the
powering tests will be revisited and their time durations justified.
Risks, failure scenarios, and foreseen fall back solutions will be
presented.
The requirements and priorities for...