Conveners
Cryogenics
- Laurent Tavian (AT-ACR)
-
Luigi Serio (AT-ACR)12/05/2005, 09:15slidesThe prerequisite, requirements and constraints for a sector cool-down will be reminded. The different phases of cool-down, commissioning and operation for magnet powering will be reviewed with particular emphasis on what will be tested or verified for the first time (i.e. tests which could not be performed on String 1 & 2 and tests on equipments which are commissioned for the first...Go to contribution page
-
Juan Casas Cubillos (AT-ACR)12/05/2005, 09:45slidesThis talk will address the current status of the controls for the LHC, the schedule for the procurement of the tunnel electronics and control logic, the tasks associated with both the QRL reception test and the full LHC sector commissioning, and will give some comments on the feasibility with respect to the official LHC schedule. The cryogenic instrumentation and controls are...Go to contribution page