Conveners
Cryogenics
- Laurent Tavian (AT-ACR)
Luigi Serio
(AT-ACR)
12/05/2005, 09:15
slides
The prerequisite, requirements and constraints for a sector cool-down
will be reminded. The different phases of cool-down, commissioning
and operation for magnet powering will be reviewed with particular
emphasis on what will be tested or verified for the first time (i.e.
tests which could not be performed on String 1 & 2 and tests on
equipments which are commissioned for the first...
Juan Casas Cubillos
(AT-ACR)
12/05/2005, 09:45
slides
This talk will address the current status of the controls for the
LHC, the schedule for the procurement of the tunnel electronics and
control logic, the tasks associated with both the QRL reception test
and the full LHC sector commissioning, and will give some comments on
the feasibility with respect to the official LHC schedule. The
cryogenic instrumentation and controls are...