Session

Compatibility of Hardware Commissioning with Installation

not assigned
13 May 2005, 09:15
864-1-C02 (CERN, Prévessin)

864-1-C02

CERN, Prévessin

Conveners

Compatibility of Hardware Commissioning with Installation

  • Claude Hauviller (TS-IC)

Presentation materials

There are no materials yet.

  1. Katy Foraz (TS-IC)
    13/05/2005, 09:15
    slides
    The “proper” hardware commissioning will start once the machine and experimental elements in the tunnel are installed and the individual systems tests are done, in both sectors around an even point. This implies co-activities between the two phases; as for example individual systems tests (such as short circuit tests, etc.) will be done during the installation phase without...
    Go to contribution page
  2. Daniela Macina (TS-LEA)
    13/05/2005, 09:35
    slides
    The installation of the experimental areas will be briefly reviewed with particular attention paid to the installation of the radiation shielding and vacuum beam pipes which may interfere with the Hardware Commissioning of the magnets located close by (low beta triplets and compensator magnets). The LHCb detector installation and the Hardware Commissioning of the Cryogenic equipment...
    Go to contribution page